Skip to main content

Serbia’s Zezelj bridge still to be repaired 15 years after NATO bombing

A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it.
May 2, 2014 Read time: 1 min
A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it. Dnevnik wrote that it is unclear when the bridge will be completed, mainly due to disputes between the main investor, the national railways company Zeleznice Srbije (ZS), and a company that has been awarded the rehabilitation project, the Spanish and Italian consortium of Azvi, Tadei, Horta and Koslada. Deadline for the completion of the bridge’s repairs ended last year.

Related Content

  • Colombia connectivity to improve with new bridge
    February 2, 2017
    Construction work on Colombia’s landmark Yati-Bodega bridge is already 50% complete. The 2.3km Puente de la Reconciliacion Bridge spans the Magdalena River and when complete, will be the longest in the country. The project is challenging however, due to the river’s flow rate as well as the underlying geology. Once the bridge opens to traffic, it will connect the municipality of Mompox with the rest of Colombia’s Bolivar department. At present Mompox and Magangue are difficult to reach by road due to the lac
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Serbian connection on target
    March 2, 2012
    Work is progressing well on the Beska Bridge over the Danube River in Serbia.