Skip to main content

Serbia’s Zezelj bridge still to be repaired 15 years after NATO bombing

A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it.
May 2, 2014 Read time: 1 min
A Serbian daily newspaper has reported that Zezelj road and railway bridge, over the Danube river by the city of Novi Sad, is still in need of repairs, more than 15 years after NATO bombs destroyed it. Dnevnik wrote that it is unclear when the bridge will be completed, mainly due to disputes between the main investor, the national railways company Zeleznice Srbije (ZS), and a company that has been awarded the rehabilitation project, the Spanish and Italian consortium of Azvi, Tadei, Horta and Koslada. Deadline for the completion of the bridge’s repairs ended last year.

Related Content

  • Temporary bridge set for Tretten in Norway
    November 9, 2022
    The Norwegian Public Roads Administration has been installing temporary bridges after it closed 14 timber structures following the collapse of the Tretten Bridge.
  • Bangladesh bridge project for XCMG cranes
    March 7, 2018
    Six XCMG crawler cranes are working hard on the construction of the Padma Bridge in Bangladesh. This is a landmark project for Bangladesh, as the 6.15km structure will provide a new link between the south-west of the country and the northern and eastern regions. When the bridge is complete it will connect Louhajong, Munshiganj to Shariatpur and Madaripur. In addition to the main bridge section, there is an additional 3.8km approach bridge, which is also very important to the project. The Padma Bridge is
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b