Skip to main content

Serbia's key link

The southern section of Serbia's Corridor 10 highway is now carrying traffic, with only final works needed to complete the link.
February 27, 2012 Read time: 1 min
The southern section of Serbia's Corridor 10 highway is now carrying traffic, with only final works needed to complete the link. This highway section measures 88km long and runs from Horgos to Bikovo, with all works on the highway section due to be completed by August 2011. Works on the 200km Corridor 10 section that runs from the Hungarian border through the City of Novi Sad, across the Beska Bridge over the Danube river and through to Belgrade is due for completion by early September 2011. The southern part will be 200km long. Work on the Horgos-Novi Sad section of the Corridor 10 highway is estimated to cost some ?97.74 million and the client is Serbian roads company 3235 Koridori Srbije.

For more information on companies in this article

Related Content

  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop
  • Serbia: Laz, Munjino Brdo tunnels restart
    June 3, 2020
    The tunnels are part of the A2, also called the Miloš the Great Motorway.
  • Chinese funding financing Serbian road development
    May 19, 2017
    A Chinese contractor looks likely to be building sections of the Corridor 11 highway in Serbia. This follows successful discussions between Serbia and China. These relate to the sections of Corridor 11 from Preljina to Pozega and from Pozega to Boljare that lead towards the border with neighbouring Montenegro. Meanwhile discussions are also being held between Serbia and China with regard to the Ruma to Novi Sad highway, which is also known as the Fruskogorski Koridor. The works are expected to be worth €400
  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2