Skip to main content

Serbia’s highway construction programme is on track

Serbia is on schedule with its construction programme for highways and roads. The country looks set to have completed 64km of highways and 15km of parallel or link roads during 2014. This figure compares favourably with the average 50km/year construction rate across most European countries currently building highways. Meanwhile Serbian road company Koridori Srbije looks set to merge with the road company Putevi Srbije. Koridori Srbije has already built 51km of highways during 2014. The remainder should be c
December 4, 2014 Read time: 1 min
Serbia is on schedule with its construction programme for highways and roads. The country looks set to have completed 64km of highways and 15km of parallel or link roads during 2014. This figure compares favourably with the average 50km/year construction rate across most European countries currently building highways. Meanwhile Serbian road company 3235 Koridori Srbije looks set to merge with the road company Putevi Srbije. Koridori Srbije has already built 51km of highways during 2014. The remainder should be completed by the end of 2014. The plan calls for Corridor 10 to be completed by the end of 2016, and for Corridor 11 to be completed in 2017.

For more information on companies in this article

Related Content

  • Chinese firms to work on Serbia’s Corridor 11 project
    November 30, 2015
    Serbia and China have signed a memorandum of understanding for construction of two sections of Serbia’s Corridor 11. The MoU was inked in during Serbian Prime Minister Aleksandar Vucic’s visit to the Chinese capital Beijing last week. Serbia’s Tanjug news agency reported that Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of
  • Serbia: Putevi Srbije to build 2.4km of Corridor 11 access road
    April 14, 2015
    Serbian road contractor Putevi Srbije will build around 2.4km of access roads around the town of Ljig in central Serbia, according the state Ministry of Construction, Transport and Infrastructure. The access roads will be for the Corridor 11 motorway, which is under construction from the Serbian capital Belgrade running southwest into Montenegro, ending at the Adriatic coastal tourist town of Bar. The Belgrade-Bar motorway will be around 280km long and be the main link for a ferry service from the Ita
  • Serbia: end in sight for finishing southern part of Corridor 10
    August 26, 2016
    Serbia’s minister of construction and infrastructure, Zorana Mihajlovic, said that the southern part of the Corridor 10 motorway is expected to be completed by the end of 2017. Speaking to the Beta news agency, she also said that work on the Corridor 11 motorway, on the Ub-Lajkovac section, is being carried out in cooperation with Chinese partner company Shang Dong. The government has also signed an agreement for construction of the Surcin-Obrenovac part of the Corridor 11. Ongoing talks between Serbi
  • Congestion and safety concerns over Serbia’s roads
    February 23, 2012
    With traffic flows on the increase, Serbia needs to improve its road network and safety record, reports Gordon Feller. Serbia's road network needs to upgrade its road system against the backdrop of increased traffic flows. Serbia is crossed by segments of the important Trans European network (TEN). Corridor X with its branches Xb (Belgrade-Budapest) Xc (Nis-Sofia), and Xd (Nis-Presevo), represent the most important transit routes in the Republic, connecting Austria/Hungary, Slovenia/Croatia, and Bulgaria/Ma