Skip to main content

Serbian key road project well underway

In Serbia construction work is on track for the Zemun-Borca road project. The new road link should be open to traffic by the end of 2014. The cost of the project has not been revealed however. Some stretches of the new link are already being used unofficially, by pedestrians.
December 4, 2014 Read time: 1 min
In Serbia construction work is on track for the Zemun-Borca road project. The new road link should be open to traffic by the end of 2014. The cost of the project has not been revealed however. Some stretches of the new link are already being used unofficially, by pedestrians.

Related Content

  • Key SR-91 highway upgrade underway in California
    December 16, 2013
    In the US state of California, construction is now underway for the State Route 91 (SR-91) Corridor Improvement Project. This improved section for SR-91 will run through the Corona and Riverside, both of which are located in Riverside County. The project will extend the SR-91 Tolled Express Lanes in Orange County into Riverside County, a distance of 17.6km. This includes a 13km stretch into Riverside County on SR-91, with a 5km flyover connecting to Interstate 15 from SR-91. Riverside County Transportation
  • Poland’s planned programme of highway construction
    December 13, 2013
    Poland’s National Road Construction Programme has been amended for the 2011-15 period. One of the new projects being handled is for the southern section of the ring-road (POW) for capital Warsaw will benefit. The tender process is opening for the construction of an 18.5km section of the S2 dual carriageway from Pulawska junction to Lubelska junction. The General Direction of National Roads and Motorways (GDDKiA) is keen for the southern Warsaw ring road to be open to traffic by 2019. The Pulawska-Lubleska s
  • Colombia traffic congestion concern
    January 8, 2019
    Concern has been expressed in Colombia at potential traffic congestion around the new Tunel de Oriente in Antioquia. Existing roads in Baltimore in Medellin and Sajonia in Rionegro are thought to face potential traffic issues once the tunnel opens, as they have not yet been upgraded. The authorities in Rio negro have launched plans to upgrade 29km of link roads for the tunnel. However further works will be required. Some new bridges will also be constructed to help traffic flow. Meanwhile work is starting
  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.