Skip to main content

Serbia highway work commencing

Construction of the Preljina-Pozega section of Serbia’s Corridor 11 route is commencing in March 2019. The project is challenging due to the terrain and this section of the route will include 32 bridges, 11 overpasses, three tunnels and three interchanges. The work is itself being carried out in three sections. One 8.3km section runs from Preljina to Prijevor while there is an 15.5km section from Prijevor to Lucani and a 7km stretch joining Lucani with Pozega.
February 8, 2019 Read time: 1 min

Construction of the Preljina-Pozega section of Serbia’s Corridor 11 route is commencing in March 2019. The project is challenging due to the terrain and this section of the route will include 32 bridges, 11 overpasses, three tunnels and three interchanges. The work is itself being carried out in three sections. One 8.3km section runs from Preljina to Prijevor while there is an 15.5km section from Prijevor to Lucani and a 7km stretch joining Lucani with Pozega.

Related Content

  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Montenegro highway budget revealed
    March 2, 2017
    Chinese contractor China Roads and Bridges Company (CRBC) is spending €194 million to construct a key stretch of Montenegro’s Bar-Boljare highway during 2017. The Exim Bank in China is providing a loan facility worth €889.3 million to Montenegro’s Government to pay for the project. The loan is being provided over a 20-year period. This key stretch of the Bar-Boljare highway is 40km long and presents many technical challenges as it is one of the most complex sections of the route. This stretch will include 1
  • Bosnia gets EBRD loan for Corridor 5c work
    January 8, 2024
    The project will include the construction of an interchange and a 15 km dual-carriage motorway section, along the Mostar North-South section.
  • Chile’s new urban highway link
    May 2, 2022
    Nestling in a valley beside the Andes mountain range, Santiago has a growing population and has suffered from increasingly heavy congestion in recent years, requiring a new urban road link for which safety has been set as a priority for drivers - *iRAP reports