Skip to main content

Serbia completes Ostružnica Bridge

The 2km long bridge is the largest of all the Belgrade bypass bridges.
By David Arminas June 25, 2020 Read time: 1 min
The steel deck sections were built in a nearby shipyard (photo courtesy Serbian Ministry of Transport and Infrastructure)

Serbia has completed another bridge as part of a major bypass around the capital city Belgrade and which is part of the pan-European route E-75.

Zorana Mihajlovic, Serbia’s minister of transport and infrastructure, officially opened the remaining two lanes of the four-lane US$40.8 million Ostružnica Bridge over the Sava River, near the suburb of Ostružnica.

The 2km long bridge is the largest structure of all the bypass’s bridges and tunnels and is part of the 47.4km Dobanovci-to-Bubanj Potok section (officially section B).

The steel deck sections, some up to 80m long, were built in a nearby shipyard and barged to the site. The last steel deck section – 65m long and weighing around 400 tonnes - was pulled up into place from a barge on the river in December.

The 69km Belgrade bypass includes around 45km of the A1 motorway. Construction of the bypass started in 1990 with progressive openings of sections since then.

Related Content

  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Pattullo Bridge deck near completion
    July 29, 2025
    For several weeks, crews have been installing concrete deck panels, steel girders and stay cables outward from the towers of the bridge that spans the Fraser River near Vancouver, Canada.
  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu
  • Final beam for Gerald Desmond Bridge replacement
    May 1, 2020
    The US$1.47 billion project was started in 2013 and open later this year.