Skip to main content

Serbia completes Ostružnica Bridge

The 2km long bridge is the largest of all the Belgrade bypass bridges.
By David Arminas June 25, 2020 Read time: 1 min
The steel deck sections were built in a nearby shipyard (photo courtesy Serbian Ministry of Transport and Infrastructure)

Serbia has completed another bridge as part of a major bypass around the capital city Belgrade and which is part of the pan-European route E-75.

Zorana Mihajlovic, Serbia’s minister of transport and infrastructure, officially opened the remaining two lanes of the four-lane US$40.8 million Ostružnica Bridge over the Sava River, near the suburb of Ostružnica.

The 2km long bridge is the largest structure of all the bypass’s bridges and tunnels and is part of the 47.4km Dobanovci-to-Bubanj Potok section (officially section B).

The steel deck sections, some up to 80m long, were built in a nearby shipyard and barged to the site. The last steel deck section – 65m long and weighing around 400 tonnes - was pulled up into place from a barge on the river in December.

The 69km Belgrade bypass includes around 45km of the A1 motorway. Construction of the bypass started in 1990 with progressive openings of sections since then.

Related Content

  • Serbia seals the deal for start of Belgrade Corridor 11 ring-road
    July 21, 2016
    Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road. According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with Azvirt, the company from Azerbaijan, and China's Sinohidro. Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communica
  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Serbia: end in sight for finishing southern part of Corridor 10
    August 26, 2016
    Serbia’s minister of construction and infrastructure, Zorana Mihajlovic, said that the southern part of the Corridor 10 motorway is expected to be completed by the end of 2017. Speaking to the Beta news agency, she also said that work on the Corridor 11 motorway, on the Ub-Lajkovac section, is being carried out in cooperation with Chinese partner company Shang Dong. The government has also signed an agreement for construction of the Surcin-Obrenovac part of the Corridor 11. Ongoing talks between Serbi