Skip to main content

Sections nearly ready for Indonesia’s trans-Sumatra route

Key sections of Indonesia’s important trans-Sumatra highway project are nearly ready for traffic. A 350km stretch that will connect with the city of Palembang should be open shortly. Meanwhile construction of the 141km Bakauheni to Terbanggi Bedar stretch is now starting, with this work being carried out by contractor Hutama Karya. The plans for the 2,765km trans-Sumatra toll road project call for the route to be complete by 2024. This will connect Aceh at the northern end of Sumatra with Lampung on the so
March 19, 2019 Read time: 1 min

Key sections of Indonesia’s important trans-Sumatra highway project are nearly ready for traffic. A 350km stretch that will connect with the city of Palembang should be open shortly. Meanwhile construction of the 141km Bakauheni to Terbanggi Bedar stretch is now starting, with this work being carried out by contractor 5206 Hutama Karya.

The plans for the 2,765km trans-Sumatra toll road project call for the route to be complete by 2024. This will connect Aceh at the northern end of Sumatra with Lampung on the south east coast.

For more information on companies in this article

Related Content

  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • Philippines planning series of highway projects
    August 10, 2017
    A series of major highway projects are now being planned in the Philippines. The largest of this most recent set of highway projects to be announced is for the US$1.24 billion NLEx-Cavitex Port Expressway Link put forward. Measuring 15km the route would be constructed featuring four lanes. This proposed link would connect the Cavite Expressway and North Luzon Expressway in Metro Manila. The proposal for the project has been made by Manila North Tollways, a subsidiary of Metro Pacific Investments.
  • Key Mexican road route nears completion
    September 5, 2019
    Work on Route 15 that connects Nogales with Estacion Don in Mexico is nearly complete. Located in Mexico’s Sinaloa State this route is of particular importance for the country as it connects with the US border at Nogales and is vital for trade. Around US$1.06 billion has been spent on improving the 651km Route 15 and the upgraded road should be carrying traffic along its entire length by November 2019.
  • Taking the coast road on Reunion Island
    April 4, 2017
    An ambitious project on Reunion Island will improve transport