Skip to main content

Sections nearly ready for Indonesia’s trans-Sumatra route

Key sections of Indonesia’s important trans-Sumatra highway project are nearly ready for traffic. A 350km stretch that will connect with the city of Palembang should be open shortly. Meanwhile construction of the 141km Bakauheni to Terbanggi Bedar stretch is now starting, with this work being carried out by contractor Hutama Karya. The plans for the 2,765km trans-Sumatra toll road project call for the route to be complete by 2024. This will connect Aceh at the northern end of Sumatra with Lampung on the so
March 19, 2019 Read time: 1 min

Key sections of Indonesia’s important trans-Sumatra highway project are nearly ready for traffic. A 350km stretch that will connect with the city of Palembang should be open shortly. Meanwhile construction of the 141km Bakauheni to Terbanggi Bedar stretch is now starting, with this work being carried out by contractor 5206 Hutama Karya.

The plans for the 2,765km trans-Sumatra toll road project call for the route to be complete by 2024. This will connect Aceh at the northern end of Sumatra with Lampung on the south east coast.

For more information on companies in this article

Related Content

  • Aceh Road Rehabilitation project wins key IRF GRAA award
    May 15, 2014
    The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries. Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated th
  • Indonesia planning new tolled routes
    July 24, 2019
    Indonesia is planning to construct more tolled highways as well as bridges. One novel proposal is for a new tolled road that will run along the sea dike protecting the Jakarta Coast. This new road is intended to lower congestion levels in North Jakarta by providing an alternative route to existing links. Indonesia’s Transport Ministry is working with the Korea International Partnership Agency and the Dutch Water and Infrastructure Management Agency on the National Capital Integrated Coastal Development (NC
  • Trans-Sahara Highway soon to connect Niger with Algeria
    December 4, 2014
    Construction work started in November on the last part of the Trans-Sahara Highway connecting the Algerian capital Algiers to the Nigerian capital and port Lagos.
  • Norway moves toward more E39 coastal road improvements
    April 4, 2019
    Norway is working on plans to make more of the major north-south E39 coastal route a ferry-free highway, coasting €35.3 billion, according to media. In Norway, the trans-European route 39 is part national road system and is developed and maintained by the public roads administration. It runs for 1,330km along the coast from Klett just south of Trondheim to Nørresundby. Norway’s E39 is mostly a two-lane undivided road with only relatively short sections near Stavanger, Trondheim and Bergen being motorw