Skip to main content

Second giant moveable scaffolding system set for Mersey Gateway

A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the Mersey Gateway Project, a toll bridge over the Mersey River in England. The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.
May 4, 2016 Read time: 3 mins

A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the 6126 Mersey Gateway Project, a toll bridge over the Mersey River in England.

The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.

The new MSS, due to arrive next month, is the same specification as Trinity, the first MSS machine that is building the north approach viaduct in the town of Widnes. Halton schools have been invited to take part in a competition to name the second machine, which will start work on the south approach viaduct in September.

When fully assembled, the latest MSS will measure 157m long - the length of around one and a half football pitches - 8m high and 22m across at its widest point. And at 1,700tonnes, the steel structure will weigh the equivalent of 140 double decker buses.

No UK company has the capacity to design, build and operate a machine of this specification so Merseylink has had them built in China.

Workers will begin to assemble the MSS on site at Astmoor, a suburb of Runcorn, in the summer. It will be erected around the first pier of the approach viaduct, about 12.5m above the ground.

Construction joint venture Merseylink decided to deploy an additional MSS machine to save valuable time dismantling, then transporting and reassembling Trinity on the south side of the river.

Work started on site in May 2014 to build the six-lane toll bridge that is scheduled to open in the autumn of 2017. As well as construction of the bridge, works include upgrading 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of traffic uses the new bridge.

The reinforced concrete deck span was revealed when Trinity moved to its second casting position. It was the first of 11 spans that will eventually be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.

The span connects the beginning of the approach viaduct from the north abutment in Widnes to the first supporting pier. It measures around 60m long and 18m wide and is angled at 5 degrees to allow vehicles to travel safely around the curve of the approach road.

“Bringing in another MSS will provide additional resilience and ensure that we remain on track to open the new bridge in autumn 2017," said Richard Walker, project director at Merseylink.

To read a World Highways report on Trinity, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 26084 0 oLinkInternal click here WH report on Trinity false /sections/eurofile/features/first-deck-span-completed-for-mersey-gateways-north-approach-viaduct/ false false%>.

For more information on companies in this article

Related Content

  • European Road Conference: Corridors for Shared Prosperity and transport Connectivity
    May 10, 2018
    Organised by key representative organisations of the roads and mobility sector, the European Road Conference to be held 22nd-24th October 2018 in Dubrovnik, Croatia offers an essential platform to deepen the understanding of regional mobility challenges and achieve consensus on key policy, investment and planning measures. According to IRF president & CEO C Patrick Sankey “South East Europe is at an important crossroads in the development of its connectivity programs, securing a critical role as a gateway
  • New record Volvo CE machine sales
    January 6, 2017
    Volvo Construction Equipment believes its ascendancy in the Chinese market is behind its record annual sale of 84,000 machines in 2011.
  • New record Volvo CE machine sales
    February 6, 2012
    Volvo Construction Equipment believes its ascendancy in the Chinese market is behind its record annual sale of 84,000 machines in 2011.
  • Case’s 621F wheeled loader makes European show bow at bauma
    January 6, 2017
    Case’s 12.2tonne 621F wheeled loader will make its first appearance at a European show during bauma. Powered by a second generation common-rail Tier 4 interim engine and benefiting from the use of fuel saving SCR technology, the 621F is said to have proven ZF auto powershift transmission and heavy duty axles. The model is also equipped with a 100% locking front differential for maximum traction and reduced tyre wear. Similar to other larger Case F Series wheeled loaders, the 621F has a cooling pack directly