Skip to main content

Second giant moveable scaffolding system set for Mersey Gateway

A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the Mersey Gateway Project, a toll bridge over the Mersey River in England. The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.
May 4, 2016 Read time: 3 mins

A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the 6126 Mersey Gateway Project, a toll bridge over the Mersey River in England.

The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.

The new MSS, due to arrive next month, is the same specification as Trinity, the first MSS machine that is building the north approach viaduct in the town of Widnes. Halton schools have been invited to take part in a competition to name the second machine, which will start work on the south approach viaduct in September.

When fully assembled, the latest MSS will measure 157m long - the length of around one and a half football pitches - 8m high and 22m across at its widest point. And at 1,700tonnes, the steel structure will weigh the equivalent of 140 double decker buses.

No UK company has the capacity to design, build and operate a machine of this specification so Merseylink has had them built in China.

Workers will begin to assemble the MSS on site at Astmoor, a suburb of Runcorn, in the summer. It will be erected around the first pier of the approach viaduct, about 12.5m above the ground.

Construction joint venture Merseylink decided to deploy an additional MSS machine to save valuable time dismantling, then transporting and reassembling Trinity on the south side of the river.

Work started on site in May 2014 to build the six-lane toll bridge that is scheduled to open in the autumn of 2017. As well as construction of the bridge, works include upgrading 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of traffic uses the new bridge.

The reinforced concrete deck span was revealed when Trinity moved to its second casting position. It was the first of 11 spans that will eventually be cast by the MSS for the deck of the elevated approach viaduct on the north side of the River Mersey.

The span connects the beginning of the approach viaduct from the north abutment in Widnes to the first supporting pier. It measures around 60m long and 18m wide and is angled at 5 degrees to allow vehicles to travel safely around the curve of the approach road.

“Bringing in another MSS will provide additional resilience and ensure that we remain on track to open the new bridge in autumn 2017," said Richard Walker, project director at Merseylink.

To read a World Highways report on Trinity, %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 26084 0 oLinkInternal click here WH report on Trinity false /sections/eurofile/features/first-deck-span-completed-for-mersey-gateways-north-approach-viaduct/ false false%>.

For more information on companies in this article

Related Content

  • Golden moment at INTERMAT ribbon cutting ceremony
    April 17, 2012
    Monsieur Bernard Accoyer, the president of the French National Assembly, officially opened INTERMAT 2012 with a traditional ribbon cutting ceremony. Equipped with gold-plated scissors, M Accoyer paused for the media before slicing through the tricolour ribbon on his way to an extensive 90-minute tour of the show’s exhibition halls, to savour all that the construction industry has to offer.
  • VIDEO: Wrong way down a Chinese motorway
    April 19, 2016
    It takes courage to drive down the wrong side of a motorway and a lot of nerve. But this driver in China appears to have both in large quantities as he heads off on his journey. Apparently, his passenger is his equal when it comes to sangfroid. He even appears in camera shot with a big smile on his face. Luckily no crash took place. However, the video stops just before the taxi arrives at something in the road. Was it a road block? If that driving experience wasn’t too unsettling for anyone, then c
  • David Quarmby will be a keynote speaker at ERIC 2016 in Leeds
    July 26, 2016
    David Quarmby, one of the United Kingdom’s most influential and experienced highways and transport senior executives, has been confirmed as a keynote speaker at the European Roads Infrastructure Congress – ERIC 2016 - in the autumn. Quarmby has had a long career in policy, planning, management and research in UK transport, with 39 years’ board-level experience in government, public agencies and the private sector, including London Transport and the retail food giant Sainsbury’s. Most recently he has b
  • Caterpillar is looking forward to future growth in China
    January 6, 2017
    Caterpillar is taking a long term view in China, seeing the country as having immense potential for construction. The company has a large presence at bauma China, with its display focussing on equipment crucial to the Chinese market and this reflects its long experience in the country, having commenced operations in the early 1970s. Speaking at the firm’s bauma China press conference, Ed Rapp, Caterpillar Group President Construction Industry said, “Our display is about our long term position in China. Ther