Skip to main content

SDS develops SuDS material to tackle highway metals pollution

SDS says that its engineered treatment media Aqua-Xchange can be used in regulatory-compliant sustainable drainage systems - SuDS. Delivered to site in lightweight 1m³ bags, it can be deployed as stormwater treatment in highways drainage, as well as on other higher risk locations such as retail car parks, freight and logistics hubs. SDS claims that independent tests have shown its Aqua-Xchange removes 99% of dissolved copper and zinc, toxic metals identified by Highways England as priority pollutants
November 30, 2018 Read time: 3 mins
SDS’s Aqua-Xchange is a flexible and granular material that captures copper and zinc in surface water runoff from motorways, trunk roads and other high-traffic areas
SDS says that its engineered treatment media Aqua-Xchange can be used in regulatory-compliant sustainable drainage systems - SuDS.


Delivered to site in lightweight 1m³ bags, it can be deployed as stormwater treatment in highways drainage, as well as on other higher risk locations such as retail car parks, freight and logistics hubs.

SDS claims that independent tests have shown its Aqua-Xchange removes 99% of dissolved copper and zinc, toxic metals identified by Highways England as priority pollutants and subject to strict regulatory controls.

Aqua-Xchange was also proven to retain these metals even when applications of road salt were simulated.

It works through a combination of naturally-occurring materials that use adsorption and ionic exchange to form unbreakable bonds with the heavy metals. It captures and retains them even in heavy storms.
 
The result is “an affordable and truly versatile new SuDS material that can be used in both existing and new drainage schemes”, according to Jo Bradley, SDS market development manager and who led the development project.

Aqua-XchangeTM has a large active surface area, enabling high-performance pollutant removal in a small space. As a result, it can be used to deliver pre-treatment as part of a vegetative SuDS scheme, enabling smaller SuDS ponds or wetlands to be designed where otherwise there would have been no room for them.

In a typical application, a layer of SDS Aqua-Xchange can be added as an additional component to a linear filter drain and can be installed at a shallow depth which avoids costly excavation and use of heavy cranes.

The SDS Aqua-Xchange can also be combined with other proprietary SuDS devices. As it can filter out finer silts and sediments, it can be deployed downstream of a hydrodynamic vortex separator such as SDS’s Aqua-Swirl that targets larger particles. It can also be combined with geo-cellular storage, such as SDS’s GEOlight, when additional attenuation is needed as part of a  roadside treatment system.

Aqua-Xchange can be included as a component in vegetative SuDS devices such as dry swales, raingardens or bio-remediation zones, so that robust retention of copper and zinc is completely assured while plants can continue to thrive as part of the landscaped design.

The company says that the Aqua-Xchange was tested to reflect a range of rainfall conditions under the observation of an independent representative from a UKAS-accredited laboratory in accordance with the British Water protocol.

Related Content

  • Rebloc wins in Estonia with its noise barrier NB100/300_8_H2/W4
    June 26, 2018
    Rebloc’s integrated noise barrier offers maximum noise protection while creating a highly effective noise barrier and vehicle restraint system. Rebloc says that its system meets the highest safety and quality standards and is tested according to European Standard EN 1317 (vehicle restraint system), EN 14388 and EN 1793 (noise barrier). The main advantage of the noise barrier system is the combination of a vehicle restraint system as a concrete safety barrier with an integrated noise barrier. It features a
  • Yorkshire Water’s time-saving 3M manhole cover repair kit
    September 26, 2013
    A novel application for an existing 3M product has given Yorkshire Water a time-saving manhole cover repair solution. When staff at the company, which maintains just under 1,000kms of water and sewerage pipework, and deploys a team of street furniture operatives to deal with reports of damaged covers, realised that in many cases the manhole cover frame was compliant but the lid had dropped within, they approached 3M to discuss a solution that would avoid excavations and time-consuming replacements. “W
  • Sanibel Causeway restoration completed
    June 2, 2025
    US$328m project restores Florida causeway devastated by Hurricane Ian in 2022
  • Gubler gets down with a Kemroc EK 100 chain cutter
    May 1, 2018
    Boulders are usually removed from site by breaking them with a hammer and then using a backhoe to extract the rubble: a time-consuming process. Swiss construction company Gubler, however, used a Kemroc EK 100 chain cutter to cut down on processing time as well as wear and tear on company equipment. With an EK 100 chain cutter mounted on their 22tonne excavator, Gubler excavated the foundations, footings and service trenches in the typical local molasse rock. The project is a large residential complex and