Skip to main content

Scottish Roads Partnership preferred bidder for M8, M73 and M74 upgrades

The Scottish Roads Partnership has been given preferred bidder status by Transport Scotland for the upgrade of the M8, M73 and M74 motorways. Work on the €484.35 million (£415 million) M8, M73 and M74 Motorway Improvements programme, which includes widening sections of each of the motorways, is scheduled to be completed by spring 2017. The Scottish Roads Partnership consortium consists of Ferrovial Agroman (Amey) and Lagan.
August 23, 2013 Read time: 1 min
RSSThe Scottish Roads Partnership has been given preferred bidder status by 4068 Transport Scotland for the upgrade of the M8, M73 and M74 motorways.

Work on the €484.35 million (£415 million) M8, M73 and M74 Motorway Improvements programme, which includes widening sections of each of the motorways, is scheduled to be completed by spring 2017. The Scottish Roads Partnership consortium consists of 2717 Ferrovial Agroman (2958 Amey) and 2340 Lagan.

For more information on companies in this article

Related Content

  • Ecuador’s joint fund system is joined by 80% of public transport operators
    December 11, 2013
    A novel system in the Ecuadorian capital of Quito requiring public transport operators to share a payment fund has been joined by 80% of operators. The new system aims to reduce competition on the roads, as, prior to adoption of the payment fund approach earlier this year, different operators sought to transport as many passengers as possible, due to their income being based on the money earned from passengers on their routes each day. Under the payment fund operation, money earned enters a joint fund w
  • Colas wins key UK road contract
    January 6, 2022
    Colas has won a key UK road contract.
  • Optimising traffic control ensures efficient use of infrastructure
    April 10, 2013
    Central and local governments are facing many challenges, not least a shortage of funds due to budget restraints in the US and Europe in particular. In other markets, ensuring efficient traffic flow is the priority, with monitoring of network status being a key tool. New technology for traffic monitoring plays a crucial role and the sector is keen to introduce new and more efficient systems. The Transport Research laboratory (TRL) has long been a pioneer of traffic control technologies and its latest MAAPc
  • Better road surfaces to last longer
    August 23, 2013
    Preservation can make roads perform better and last longer - and save money in the long run. Kristina Smith reports BAM Wegen has laid the first ever half-warm porous asphalt section on a major highway in the Netherlands. The asphalt for the 500m-long test section on the A18 near Varsseveld was produced at 105°C rather than 160°C, representing a saving on energy and CO2 emissions of around 30%.