Skip to main content

Scottish road upgrade being planned

Plans have been unveiled for a proposed road upgrade project in Scotland. These plans show the preferred route for the upgrade to the A96 between Nairn and Fochabers, towns which lie to the east of Inverness on Scotland’s North East coast. The project is being planned by Transport Scotland and will see the 45km road section being upgraded to dual carriageway status. The work will include building new crossings over the Aberdeen to Inverness rail links, as well as over the Spey, Findhorn and Lossie rivers.
December 6, 2018 Read time: 2 mins

Plans have been unveiled for a proposed road upgrade project in Scotland. These plans show the preferred route for the upgrade to the A96 between Nairn and Fochabers, towns which lie to the east of Inverness on Scotland’s North East coast. The project is being planned by Transport Scotland and will see the 45km road section being upgraded to dual carriageway status.

The work will include building new crossings over the Aberdeen to Inverness rail links, as well as over the Spey, Findhorn and Lossie rivers. Building a bridge over the Spey River will be subject to particularly strict environmental requirements as this river is central to some of Scotland’s most historic whisky distilleries.

Upgrading the A96 is long overdue as the present road does not cope well with traffic demand. The route is also subject to closures in winter, with the upgrade likely to make it easier to clear when conditions are severe. At present just 22km of the A96 route between Inverness and Aberdeen is of dual carriageway status. The plans call for the remaining 138km of the 160km A96 route between Inverness and Aberdeen to be upgraded to dual carriageway status.

Related Content

  • New tunnel between Argentina and Chile proves strong attraction for contractors
    November 27, 2013
    Interest is strong in the project to build the 14km tunnel link between Chile and Argentina, with reports stating that 23 firms having expressed an interest in the work. The twin tube tunnel will connect Argentina’s San Juan Province with Chile’s Coquimbo Province (Region IV) and will be constructed in the Andes Mountains. The Agua Negra project is set to cost somewhere in the range from US$800 million to $1 billion, although the exact price of the project has yet to be determined. Some 72% of the link will
  • Elonroad’s electric road and recharging lane for buses in Lund
    April 17, 2019
    Sweden’s Transport Administration (Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund. The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years. The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds. Lun
  • Bechtel and Enka win highway contract for Kosovo
    July 2, 2014
    Bechtel and its joint-venture partner Enka have won a contract to build a 60km highway connecting Kosovo’s capital Pristina with neighbouring Macedonia. The new Route 6 highway will help improve Kosovo’s transport links, a highly important factor for the future economic development of this small, landlocked nation. Bechtel-Enka previously constructed Kosovo’s Route 7 highway, which was completed in November 2013, a whole year ahead of schedule. The Route 7 highway with Morina on the Albanian border through
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow