Skip to main content

Scottish fixed link project planned

A Scottish fixed link project is being planned to replace a ferry service.
By MJ Woof April 30, 2020 Read time: 2 mins
The existing Corran ferry service in the west of Scotland will need to be replaced – image courtesy © Alan5766, Dreamstime.com

A new fixed link project is being considered in North West Scotland to replace an existing ferry service. A feasibility study into the project has been carried out by Stantec, which was funded by Highland Council, the Highlands and Islands Transport Partnership (Hitrans) and Highlands and Islands Enterprise.

The proposal calls for a new fixed link crossing for Loch Linnhe and the report considers the potential project as being viable. This new link would replace the existing Corran ferry service, which runs between Nether Lochaber and the Ardnamurchan peninsula.

Both tunnel and bridge options are being considered in the report. The former is likely to be more expensive with an estimated cost range of €75 million - €122.7 million  (£66 million to £108 million). The latter option meanwhile has an estimated cost range of €47.7 million – €56.8 million (£42 million - £50 million).

The ferry carries around 250,000 cars/year and some 500,000 people/year and the journey takes around 5 minutes. This is one of the busiest ferry links in Europe that relies on a single vessel. However, the ferry is ageing and has suffered a number of mechanical problems. A propulsion unit had to be replaced recently, during which time the ferry was out of service. Replacing the ferry service with a fixed link, whether a tunnel or bridge, would reduce journey times and also help develop the economy in the area.

The issue of financing has yet to be considered. The project would be too costly for the Highland Council to fund, so other sources will have to be sourced. Transport Scotland would be required to give its backing for the project, including sourcing the funding, and is considering its options at present.

Related Content

  • France’s bridge problem
    July 23, 2019
    As many as 25,000 bridges in France are considered in poor condition according to research. In a bid to tackle the problem, there have been calls for an annual budget of €120 million for the next 10 years to improve bridge condition. There are an estimated 200,000-250,000 bridges in France. An additional fund of €130 million/year is proposed to tackle the problem of ageing tunnels in France.
  • New bridge planned for Kenya’s port of Mombasa
    December 14, 2017
    Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete.
  • $308 million Phuket bridge link proposed
    July 29, 2025
    A $308 million Phuket bridge link is being proposed in Thailand.
  • Alberta eyes La Crete Ferry replacement
    September 2, 2020
    The Canadian province is considering a toll bridge over the Peace River.