Skip to main content

Scottish fixed link project planned

A Scottish fixed link project is being planned to replace a ferry service.
By MJ Woof April 30, 2020 Read time: 2 mins
The existing Corran ferry service in the west of Scotland will need to be replaced – image courtesy © Alan5766, Dreamstime.com

A new fixed link project is being considered in North West Scotland to replace an existing ferry service. A feasibility study into the project has been carried out by Stantec, which was funded by Highland Council, the Highlands and Islands Transport Partnership (Hitrans) and Highlands and Islands Enterprise.

The proposal calls for a new fixed link crossing for Loch Linnhe and the report considers the potential project as being viable. This new link would replace the existing Corran ferry service, which runs between Nether Lochaber and the Ardnamurchan peninsula.

Both tunnel and bridge options are being considered in the report. The former is likely to be more expensive with an estimated cost range of €75 million - €122.7 million  (£66 million to £108 million). The latter option meanwhile has an estimated cost range of €47.7 million – €56.8 million (£42 million - £50 million).

The ferry carries around 250,000 cars/year and some 500,000 people/year and the journey takes around 5 minutes. This is one of the busiest ferry links in Europe that relies on a single vessel. However, the ferry is ageing and has suffered a number of mechanical problems. A propulsion unit had to be replaced recently, during which time the ferry was out of service. Replacing the ferry service with a fixed link, whether a tunnel or bridge, would reduce journey times and also help develop the economy in the area.

The issue of financing has yet to be considered. The project would be too costly for the Highland Council to fund, so other sources will have to be sourced. Transport Scotland would be required to give its backing for the project, including sourcing the funding, and is considering its options at present.

Related Content

  • Stonehenge Tunnel project faces further questions
    May 22, 2019
    Plans to construct a tunnel link for the A303 route past the famous Stonehenge monument have hit further problems.
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • India mulls feasibility of bridge over Palk Straight to Sri Lanka
    October 27, 2015
    India will carry out a feasibility study on a road link between Rameswaram in Tamil Nadu state and Thalaimannar in Sri Lanka, a federal government minister has said. "It needs the consent of both countries,” said Union minister of state for road transport, highways and shipping, Pon Radhakrishnan. “The project needs to be discussed at various levels," according to a brief report by India’s Hindu newspaper. Radhakrishnan told the reporters that federal government had begun consultations to carry out a
  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.