Skip to main content

Scotland’s Queensferry Crossing opens to traffic

The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
August 30, 2017 Read time: 2 mins
The new %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 24804 0 oLinkExternal Queensferry Crossing WH Queensferry Crossing Article false /sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ true false%> in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the chronic congestion that has developed over the years on the existing bridge, which opened to traffic in 1964. The original bridge was intended to have a design life of 120 years but a massive and unprecedented boost in vehicle numbers (and gross vehicle weights) saw it handling 23 million vehicles/year, far beyond the 11 million vehicles/year it was designed to carry. The new bridge will have its official opening by the queen next week, 53 years to the day since the first Forth Road Bridge opened to drivers.

Related Content

  • IRF Examiner launched as industry resource to boost efficiency
    May 19, 2014
    Volume 1 highlights life-saving role of new methods and proven technologies around the world Since the IRF’s establishment in 1948, knowledge transfer has been the core of what the IRF does best. As industry tools and procedures evolve to meet societies’ needs, the availability of global knowledge resources is now more important than ever.
  • LIVE, from Leipzig, Germany: the ITF 2015 Annual Summit
    May 26, 2015
    If you couldn’t make it to Germany this year for the International Transport Forum’s Annual Summit, you can watch the live webcasts on the ITF website starting today. From this morning, Wednesday, at 11:00 Central European Time, the live webcast of the event will be available directly at this link: http://2015.internationaltransportforum.org/
  • JCB is offering a new range of its JS crawler excavators
    January 6, 2017
    The new generation JS crawler excavators from JCB are said to deliver increased performance along with reduced running costs. The JS220, JS260 and JS360 are all powered by Isuzu diesels that meet the Tier 4 Interim/Stage IIIB emissions requirements with reduced fuel consumption and increased torque rise. For developing markets, there is also a Tier 2 compliant version of the JS220 powered by a JCB 448 Dieselmax engine with a similar output to the 129kW Isuzu diesel in the Tier 4 Interim/Stage IIIB model. Th
  • JCB is offering a new range of its JS crawler excavators
    April 11, 2012
    The new generation JS crawler excavators from JCB are said to deliver increased performance along with reduced running costs. The JS220, JS260 and JS360 are all powered by Isuzu diesels that meet the Tier 4 Interim/Stage IIIB emissions requirements with reduced fuel consumption and increased torque rise. For developing markets, there is also a Tier 2 compliant version of the JS220 powered by a JCB 448 Dieselmax engine with a similar output to the 129kW Isuzu diesel in the Tier 4 Interim/Stage IIIB model. Th