Skip to main content

Scotland’s Queensferry Crossing opens to traffic

The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
August 30, 2017 Read time: 2 mins
The new %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 24804 0 oLinkExternal Queensferry Crossing WH Queensferry Crossing Article false /sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ true false%> in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the chronic congestion that has developed over the years on the existing bridge, which opened to traffic in 1964. The original bridge was intended to have a design life of 120 years but a massive and unprecedented boost in vehicle numbers (and gross vehicle weights) saw it handling 23 million vehicles/year, far beyond the 11 million vehicles/year it was designed to carry. The new bridge will have its official opening by the queen next week, 53 years to the day since the first Forth Road Bridge opened to drivers.

Related Content

  • Lombardini’s KDI furthers its engine excellence
    January 6, 2017
    Kohler-owned Lombardini, a leading diesel engine manufacturer up to 50 kW, is since 2007 has launched KDI - the first innovative diesel engine said to be compliant with new TIER4Final/STAGE3B emission regulations without using the DPF (diesel particulate filter). Compactness, performance, lowest fuel consumption and longest service intervals are also said by Lombardini to make the KDI the best engine in its class.
  • Lombardini’s KDI furthers its engine excellence
    April 8, 2013
    Kohler-owned Lombardini, a leading diesel engine manufacturer up to 50 kW, is since 2007 has launched KDI - the first innovative diesel engine said to be compliant with new TIER4Final/STAGE3B emission regulations without using the DPF (diesel particulate filter). Compactness, performance, lowest fuel consumption and longest service intervals are also said by Lombardini to make the KDI the best engine in its class.
  • IRF Launches New Website for World Road Statistics
    April 6, 2017
    The International Road Federation Geneva Programme Centre (IRF Geneva) has been publishing the IRF World Road Statistics (WRS), the most complete and authoritative source of data for the international road, traffic and inland transport sectors for over 50 years. For 2017, IRF Geneva is pleased to announce the launch of a new website (www.worldroadstatistics.org) dedicated to the World Road Statistics. This new website provides all the information about the WRS including the methodology; contents of sections
  • Tecnoidea Impianti plants reputation worldwide
    April 9, 2013
    With over 3,600,000m³ of water purified daily in more than 3,000 of its plants all over the world, Tecnoidea Impianti is one of the leading companies worldwide for water purification plants and sludge treatment systems. Its closed-cycle plants are aimed at marble and granites, aggregates and soil washing, tunnelling and concrete areas.