Skip to main content

Scotland’s Queensferry Crossing opens to traffic

The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
August 30, 2017 Read time: 2 mins
The new %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 24804 0 oLinkExternal Queensferry Crossing WH Queensferry Crossing Article false /sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ true false%> in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the chronic congestion that has developed over the years on the existing bridge, which opened to traffic in 1964. The original bridge was intended to have a design life of 120 years but a massive and unprecedented boost in vehicle numbers (and gross vehicle weights) saw it handling 23 million vehicles/year, far beyond the 11 million vehicles/year it was designed to carry. The new bridge will have its official opening by the queen next week, 53 years to the day since the first Forth Road Bridge opened to drivers.

Related Content

  • Wacker Neuson rebar tiers at Queensferry
    February 7, 2017
    When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor. Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK. Construction
  • ENKA wins award for work on Kosovo highway project
    May 13, 2013
    Turkish contractor ENKA and its joint venture partner Bechtel have won the Best Global Project Award from US magazine Engineering News Record (ENR) for the Kosovo Route 7 highway project. The privately owned firm ENKA and Bechtel won an award in ENR’s Global Best Competition 2013 for the Project of the Year in the category for Roads and Highways around the world. Projects in several categories competed in the awards on factors such as innovation and overcoming global challenges, implementation of safety pro
  • VIDEO: Rollerman Blondeau takes to the hills, Grimsel Pass
    July 26, 2016
    Sure, it’s a spectacular run down a mountain road. But it’s also an extremely visual reminder that highway infrastructure is important for work and play. Let’s not forget that the road - in this case Switzerland’s Grimsel Pass, 2,164m - has to be smooth enough for Jean Yves “Rollerman” Blondeau to reach those speeds without being chucked over edge and down a cliff. The pass is a driver’s delight as it crosses the continental divide in the Alps where rivers flow one way towards the North Sea and the ot
  • Czech minister Tok warns Eurovia to speed up D1 bridge repairs
    January 8, 2015
    The Czech transport minister has given construction firm Eurovia until April to start repairs on two bridges it built or face having its bank guarantees withdrawn. Transport Minister Dan Tok, who until December was the chief executive of Skanska in the Czech Republic, said he would call for a new tender for the repairs if no action is taken by Eurovia, according to a report by the Czech internet news portal iDNES. Tok said that the road bridges constructed six years ago on the D1 motorway slip road in