Skip to main content

Scotland’s Queensferry Crossing opens to traffic

The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
August 30, 2017 Read time: 2 mins
The new %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 24804 0 oLinkExternal Queensferry Crossing WH Queensferry Crossing Article false /sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ true false%> in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the chronic congestion that has developed over the years on the existing bridge, which opened to traffic in 1964. The original bridge was intended to have a design life of 120 years but a massive and unprecedented boost in vehicle numbers (and gross vehicle weights) saw it handling 23 million vehicles/year, far beyond the 11 million vehicles/year it was designed to carry. The new bridge will have its official opening by the queen next week, 53 years to the day since the first Forth Road Bridge opened to drivers.

Related Content

  • New technical centre boosts CMS Cepcor
    January 6, 2017
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.
  • New technical centre boosts CMS Cepcor
    April 18, 2013
    Crusher spares specialist CMS Cepcor has opened a new technical centre at Coalville in the UK and has now transferred its Baguley Precision Engineering business into the newly formed Precision Services Division. The company has moved machine servicing from Burton-on-Trent to the new technical centre and retained all the engineering staff. Within the centre is a CNC manufacturing capability, which will enhance the manufacturing, inspection and repair facilities at Coalville.
  • Lintec showcases redesigned CSD 1500 plant at bauma
    February 12, 2013
    Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
  • ERF and RSMA team up to deliver 1st European Road Infrastructure Congress
    January 18, 2016
    Europe’s road infrastructure is one of its largest community assets, yet today this asset faces unprecedented challenges. Shortage of public resources for maintenance, inadequate public procurement models for the delivery of infrastructure, coupled with the inevitable impact that the advent of vehicle automation will have on Europe’s infrastructure means that there is a urgent need for Europe’s road sector to work together to find solutions for the future. In this backdrop, and at a time when the UK governm