Skip to main content

Scotland’s Queensferry Crossing opens to traffic

The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
August 30, 2017 Read time: 2 mins
The new %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 24804 0 oLinkExternal Queensferry Crossing WH Queensferry Crossing Article false /sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ true false%> in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the chronic congestion that has developed over the years on the existing bridge, which opened to traffic in 1964. The original bridge was intended to have a design life of 120 years but a massive and unprecedented boost in vehicle numbers (and gross vehicle weights) saw it handling 23 million vehicles/year, far beyond the 11 million vehicles/year it was designed to carry. The new bridge will have its official opening by the queen next week, 53 years to the day since the first Forth Road Bridge opened to drivers.

Related Content

  • Five things road construction crews should not do
    June 19, 2015
    Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show. Here are five things that construction crews should not do.
  • Komatsu Europe International introduces its new HM300-3 articulated truck
    January 6, 2017
    Komatsu Europe International’s recently introduced HM300-3 articulated truck has a flywheel horsepower of 242kW and is powered by a Komatsu SAA6D125E-6 engine that is EU Stage IIIB and EPA Tier 4 Interim emission certified.
  • Komatsu Europe International introduces its new HM300-3 articulated truck
    February 7, 2012
    Komatsu Europe International’s recently introduced HM300-3 articulated truck has a flywheel horsepower of 242kW and is powered by a Komatsu SAA6D125E-6 engine that is EU Stage IIIB and EPA Tier 4 Interim emission certified.
  • The IRF Geneva is now bringing policy & practice together
    December 12, 2013
    IRF Geneva will be capitalising on its strategic position at the heart of the city’s international community to host an unprecedented opportunity for high-level dialogue with leading road-related UN agencies and international stakeholder organisations IRF’s rich programme of global events for 2013 will conclude with a rare occasion for both members and non-members to engage directly with key officials driving policy development within the United Nations and its specialised agencies.