Skip to main content

Scotland’s Queensferry Crossing opens to traffic

The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
August 30, 2017 Read time: 2 mins
The new %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 24804 0 oLinkExternal Queensferry Crossing WH Queensferry Crossing Article false /sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ true false%> in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the chronic congestion that has developed over the years on the existing bridge, which opened to traffic in 1964. The original bridge was intended to have a design life of 120 years but a massive and unprecedented boost in vehicle numbers (and gross vehicle weights) saw it handling 23 million vehicles/year, far beyond the 11 million vehicles/year it was designed to carry. The new bridge will have its official opening by the queen next week, 53 years to the day since the first Forth Road Bridge opened to drivers.

Related Content

  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack
  • Perlini Equipment for dump trucks
    January 6, 2017
    Perlini Equipment is one of the world's leading manufacturers of dump trucks – having sold over 12,000 of them worldwide since 1957. The firm currently offers machines up to a capacity of 95tonnes. Reliable and easy to drive, and with customised models available on request, the trucks are built with high quality Perlini original components, offering top-tier performance and fuel efficiency.
  • Perlini Equipment for dump trucks
    April 8, 2013
    Perlini Equipment is one of the world's leading manufacturers of dump trucks – having sold over 12,000 of them worldwide since 1957. The firm currently offers machines up to a capacity of 95tonnes. Reliable and easy to drive, and with customised models available on request, the trucks are built with high quality Perlini original components, offering top-tier performance and fuel efficiency.
  • ATS has great screen presence
    March 27, 2013
    ATS’ polyurethane wire mesh screens for industrial screenings are said to offer a wide range of advantages including long service life; easy handling; less pegging and blinding; and high screening performance with perfect undersize calibration during the screen’s working lifetime. In addition, the firm says its wire mesh screens have less sound emanating from them, while reducing the weight of the vibrating screen is said to have improved its operation. The ATS screens are equipped with hooks and fitted in