Skip to main content

Scotland’s Queensferry Crossing opens to traffic

The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
August 30, 2017 Read time: 2 mins
The new %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 24804 0 oLinkExternal Queensferry Crossing WH Queensferry Crossing Article false /sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ true false%> in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the chronic congestion that has developed over the years on the existing bridge, which opened to traffic in 1964. The original bridge was intended to have a design life of 120 years but a massive and unprecedented boost in vehicle numbers (and gross vehicle weights) saw it handling 23 million vehicles/year, far beyond the 11 million vehicles/year it was designed to carry. The new bridge will have its official opening by the queen next week, 53 years to the day since the first Forth Road Bridge opened to drivers.

Related Content

  • Scotland’s Queensferry Crossing to open in summer 2017?
    May 31, 2017
    If good weather conditions continue then Scotland’s new Queensferry Crossing should open to traffic between July and August of this year. The bridge had originally been intended to be ready by December 2016 but construction work was delayed due to tough weather conditions.
  • Three consortia to make final bids for Gordie Howe International Bridge
    January 25, 2016
    The Windsor-Detroit Bridge Authority has chosen three final bidders for the six-lane Gordie Howe International Bridge to be built between the Canadian city of Windsor and Detroit in the US state of Michigan. The estimated US$2 billion toll bridge, to be built under a public private partnership, is expected to be finished by 2020.
  • Innovative vacuum trailer system from D-TEC
    January 6, 2017
    Netherlands-based D-TEC has developed a novel vacuum tank trailer system for applications such as bentonite extraction during sample boring. An innovative steering system is said to allow the D-TEC vacuum tanktrailer to manoeuvre easily on sites where there is little space. This design also reduces tyre scrubbing and allows greater tyre life, cutting running costs over the long term. The tank trailer offers greater load capacity than previously available designs according to the firm, due to its low weight,
  • Innovative vacuum trailer system from D-TEC
    January 30, 2013
    Netherlands-based D-TEC has developed a novel vacuum tank trailer system for applications such as bentonite extraction during sample boring. An innovative steering system is said to allow the D-TEC vacuum tanktrailer to manoeuvre easily on sites where there is little space. This design also reduces tyre scrubbing and allows greater tyre life, cutting running costs over the long term. The tank trailer offers greater load capacity than previously available designs according to the firm, due to its low weight,