Skip to main content

Scotland’s Queensferry Crossing opens to traffic

The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
August 30, 2017 Read time: 2 mins
The new %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 24804 0 oLinkExternal Queensferry Crossing WH Queensferry Crossing Article false /sections/key-projects/features/scotlands-new-queensferry-crossing-over-the-forth-estuary/ true false%> in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the chronic congestion that has developed over the years on the existing bridge, which opened to traffic in 1964. The original bridge was intended to have a design life of 120 years but a massive and unprecedented boost in vehicle numbers (and gross vehicle weights) saw it handling 23 million vehicles/year, far beyond the 11 million vehicles/year it was designed to carry. The new bridge will have its official opening by the queen next week, 53 years to the day since the first Forth Road Bridge opened to drivers.

Related Content

  • Low emissions vehicles only for central London
    March 26, 2015
    UK capital London is taking further steps to reduce pollution with the introduction of an Ultra Low Emission Zone (ULEZ). This will be introduced in central London in 2020 and is intended to improve air quality across the city.
  • INTERMAT launch for Topcon total stations
    January 6, 2017
    A new range of reflectorless total stations has been developed by Topcon. Called the ES series, the new models also feature TSshield – a Topcon Group innovation using a multi-function telematics-based communication module that locates the instrument.
  • INTERMAT launch for Topcon total stations
    February 3, 2012
    A new range of reflectorless total stations has been developed by Topcon. Called the ES series, the new models also feature TSshield – a Topcon Group innovation using a multi-function telematics-based communication module that locates the instrument.
  • First-time exhibitor CMS Cepcor to display replacement crusher spare parts/crusher liners
    March 11, 2013
    First-time exhibitor CMS Cepcor will exhibit its range of replacement crusher spare parts and premium crusher liners at bauma 2013. Recently awarded the Queen’s Award for Outstanding Achievement in International Trade, CMS Cepcor currently exports to over 100 countries. Despite the worldwide economic recession and credit crisis, the company says its sales turnover increased by over 100% since 2010. “This growth has been achieved through a focus on optimisation of web presence together with an engineering f