Skip to main content

Scotland’s Queensferry Crossing to open in summer 2017?

If good weather conditions continue then Scotland’s new Queensferry Crossing should open to traffic between July and August of this year. The bridge had originally been intended to be ready by December 2016 but construction work was delayed due to tough weather conditions.
May 31, 2017 Read time: 1 min
The new Queensferry Crossing, seen here at an earlier stage of construction, was originally intended to open to traffic in late 2016 but tough weather conditions delayed the opening
If good weather conditions continue then Scotland’s new Queensferry Crossing should open to traffic between July and August of this year. The bridge had originally been intended to be ready by December 2016 but construction work was delayed due to tough weather conditions. However in recent months the weather has been less challenging and has allowed work to continue.


The £1.35 billion project to replace the Forth Road Bridge has been required due to heavy wear and tear the existing structure has suffered from carrying significantly more and heavier traffic than it was designed for. There have also been concerns over corrosion in the main cables of the existing suspension bridge, although further corrosion was halted by the introduction of a novel de-humidification process.

Opening the new Queensferry Crossing will allow the existing Forth Road Bridge to be used as a public transport corridor for buses and taxis. There are also possible plans for the existing bridge to carry trams in the future.

Related Content

  • The environmental case for geosynthetics
    August 8, 2022
    Huesker, a global manufacturer of geosynthetics and technical textiles, explains how incorporating geosynthetic material can boost a project’s environmental credentials*.
  • A new study is being carried out for a proposed bridge project for the UK’s Thames River
    April 4, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • Julián Núñez, head of ASECAP offers a little Spanish enlightenment
    May 1, 2018
    Julián Núñez, president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth. People want to avoid the pain. This is perhaps a bad analogy to use in the case of Julián Núñez, president of ASECAP - European Association of Operators of Toll Road Infrastructures. Núñez had just sat