Skip to main content

Scotland to trial an all-electric road gritter unit from Bucher

Transport for Scotland will be trialling an all-electric gritter unit from Swiss company Bucher Municipal along the Forth Bridges this winter. The Electra 100% Electric Gritter: SEIV 19 – 350 is a version of Bucher’s Phoenix Electra in which a 48V electrical system replaces the usual hydraulic systems. It is powered by a lithium battery and brushless motors with dedicated and integrated inverter. Bucher says that the set-up avoids power losses and allows independent and proportional energy absorptions and
November 15, 2019 Read time: 2 mins
Transport for Scotland will use the Electra 100% Electric Gritter SEIV 19 – 350 on the Forth Bridge this winter

Transport for Scotland will be trialling an all-electric gritter unit from Swiss company Bucher Municipal along the Forth Bridges this winter.

The 2732 Electra 100% Electric Gritter: SEIV 19 – 350 is a version of Bucher’s 5903 Phoenix Electra in which a 48V electrical system replaces the usual hydraulic systems. It is powered by a lithium battery and brushless motors with dedicated and integrated inverter. Bucher says that the set-up avoids power losses and allows independent and proportional energy absorptions and management for each motor.

Lithium technology also allows battery partial charge during the salt refilling operation, even if the battery is not flat.

The carrier vehicle needs no modification because the Phoenix Electra is not run off the truck’s power. It is a real plug-and-play that can be mounted on each truck having adequate load capacity, savings all costs related to the truck installation and equipment.

Transport for Scotland said it has 213 gritters at over 40 depots across the country. Specialist route-specific snow plans have been produced, in conjunction with road operators and Police Scotland, for the M8, M74, M77 and M80 motorways, following the significant snow events of recent years.

Salt barns are full and hold almost 550,000 tonnes, which is more salt than was used during the whole of last winter. A gritter tracker software solution will be running again, letting people see live movement of gritters on the trunk road network and a trail with an age range for where gritters have previously passed along trunk routes.

“We can’t prevent the weather, but we can make sure we’re as well prepared as possible,” said Michael Matheson, the Scottish government’s cabinet secretary for transport, infrastructure and connectivity.

For more information on companies in this article

Related Content

  • Earthmoving developments for construction machines
    August 14, 2017
    Excavators, wheeled loaders and ADTs have all seen improvements for this year. New developments in earthmoving machines continue to help improve working efficiency for contractors. The excavator market is the largest single segment of the construction machine sector, with competition being tough between the major players, and a steady stream of new models coming to market. Doosan has launched the new Stage IV compliant DX225LC-5 crawler excavator, which is said to offer high performance, fuel efficiency, r
  • Electric paving becoming a reality
    July 21, 2025
    Electric asphalt paving machines are becoming a reality – Mike Woof writes
  • Re-inventing Africa’s Transport Model - The 2nd IRF Africa Regional Congress
    September 13, 2017
    Lack of effective coordination among Africa’s transportation stakeholders is inhibiting the impacts of existing programs, but technology and innovation are increasingly understood as essential drivers to propel Africa forward in meeting its development goals. These were some of the main findings of the 2nd IRF Africa Regional Congress which was held July 11th-13th in Windhoek, Namibia.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.