Skip to main content

Saudi Arabia sea crossing planned

A new sea crossing is planned for Saudi Arabia. The 3.3km link will connect with a new commercial and residential development project located at Shurayrah.. The crossing will feature two causeways connected by a section of bridge and will connect with a hub island featuring new properties. The designers say that the sea crossing is being so as not to impede water flow and also so as to minimise impact to sea live in the area.
July 24, 2019 Read time: 1 min

A new sea crossing is planned for Saudi Arabia. The 3.3km link will connect with a new commercial and residential development project located at Shurayrah.. The crossing will feature two causeways connected by a section of bridge and will connect with a hub island featuring new properties. The designers say that the sea crossing is being so as not to impede water flow and also so as to minimise impact to sea live in the area.

Related Content

  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • What happens when you run out of land for roads?
    November 1, 2021
    Mumbai, the financial capital of India has a population of 12.4 million located in a small area of 437sq.km, surrounded by the sea with nowhere to expand. An increase in congestion on Mumbai’s roads has put a strain on the city’s infrastructure. The result has been long commute times with idling cars contributing to an alarming rise in poor air quality, impacting the quality of life for residents
  • Cebu Bridge sides joined in Philippines
    October 8, 2021
    The two sides of the Cebu Bridge in the Philippines have been joined.
  • Chilean bridge project to Chiloe Island delayed
    October 31, 2018
    Delays to the project to construct Chile’s Chacao Bridge mean that an additional two years may be required for the work. The work is now being carried out solely by a consortium, Consorcio Puente Chacao, headed by the South Korean contractor Hyundai.