Skip to main content

Saudi Arabia sea crossing planned

A new sea crossing is planned for Saudi Arabia. The 3.3km link will connect with a new commercial and residential development project located at Shurayrah.. The crossing will feature two causeways connected by a section of bridge and will connect with a hub island featuring new properties. The designers say that the sea crossing is being so as not to impede water flow and also so as to minimise impact to sea live in the area.
July 24, 2019 Read time: 1 min

A new sea crossing is planned for Saudi Arabia. The 3.3km link will connect with a new commercial and residential development project located at Shurayrah.. The crossing will feature two causeways connected by a section of bridge and will connect with a hub island featuring new properties. The designers say that the sea crossing is being so as not to impede water flow and also so as to minimise impact to sea live in the area.

Related Content

  • Safer highway containment continues to grow
    March 8, 2012
    A steady flow of new technology and systems is ensuring the highway barrier sector is seeing major gains in safety. Mike Woof reports A combination of technological development and tougher regulations are ensuring a constant flow of new safety barrier solutions for the highway sector. Issues such as containment and deflection are high on the technical agenda, while a wide array of technologies is being developed to meet specific needs for certain applications. Both in the US and Europe, an increased focus o
  • Colombia’s Toyo Tunnel project providing key link
    May 20, 2016
    Colombia’s Toyo Tunnel project will provide an important new link for the country, writes Mauro Nogarin. The new Toyo Tunnel project is of immense importance for Colombia, improving transportation and providing an important road link. The work is being carried out by the Antioquia to the Sea Consortium, which comprises of FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. These firms are building the Toyo Tunnel project and the various access roads, with the
  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.