Skip to main content

Saudi Arabia sea crossing planned

A new sea crossing is planned for Saudi Arabia. The 3.3km link will connect with a new commercial and residential development project located at Shurayrah.. The crossing will feature two causeways connected by a section of bridge and will connect with a hub island featuring new properties. The designers say that the sea crossing is being so as not to impede water flow and also so as to minimise impact to sea live in the area.
July 24, 2019 Read time: 1 min

A new sea crossing is planned for Saudi Arabia. The 3.3km link will connect with a new commercial and residential development project located at Shurayrah.. The crossing will feature two causeways connected by a section of bridge and will connect with a hub island featuring new properties. The designers say that the sea crossing is being so as not to impede water flow and also so as to minimise impact to sea live in the area.

Related Content

  • Metro Pacific Tollways starts work on Cebu-Cordova Link bridge
    July 10, 2018
    Metro Pacific Tollways has started construction of a toll bridge to connect Mactan island to mainland Cebu.
  • Tunnels and bridges, improving Argentina's major road link
    May 2, 2012
    A road improvement plus tunnel and bridge building contract in an area once inhabited by dinosaurs in northern Argentina, is a small but key part of an ambitious project to complete a road that will eventually link the Atlantic and Pacific coasts of Latin America - Adriana Potts reports. Remote, rough and spectacular are words that come to mind when describing the mountains of Ischigualasto in Argentina's northern province of San Juan This is the only place in the world where an undisturbed sequence of rock
  • New bridge planned for Kenya’s port of Mombasa
    December 14, 2017
    Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete.
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main