Skip to main content

Saudi Arabia to Bahrain causeway connection

Saudi Arabia and Bahrain are finalising plans for the US$3 billion second causeway project that will connect the countries. The project will be for a railway and road between both countries with the plans due to be complete by the end of 2015. Canadian company SNC Lavalin completed its feasibility study for the project in September 2015. The second causeway will measure 26km long and has been named King Hamad Causeway. SNC Lavalin suggested two routes while the project is scheduled to be completed in 2018.
October 9, 2015 Read time: 1 min
Saudi Arabia and Bahrain are finalising plans for the US$3 billion second causeway project that will connect the countries. The project will be for a railway and road between both countries with the plans due to be complete by the end of 2015. Canadian company 2482 SNC Lavalin completed its feasibility study for the project in September 2015. The second causeway will measure 26km long and has been named King Hamad Causeway. SNC Lavalin suggested two routes while the project is scheduled to be completed in 2018.

For more information on companies in this article

Related Content

  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • Colombia road and tunnel connection to Medellin Airport
    September 13, 2017
    Work is well underway on a new road and tunnel project, which will provide an improved connection between the Colombian city of Medellin and its airport. The new link will measure 24km long in all and the construction work is expected to cost over US$342 million, with completion due at the end of 2018. The project is known overall as the Oriente Tunnel, with the work being carried out as a concession by Concesion Tunel Aburrá-Oriente. The project comprises four sections in all. These are the 786m Seminario
  • Bahrain: work to start on Shaikh Jaber Al Ahmed Al Sabah Highway
    August 5, 2015
    In Bahrain, upgrade work on the Shaikh Jaber Al Ahmed Al Sabah Highway will start in August. Under the US$124 million contract, a two-level interchange is proposed for the Nuwaidrat roundabout, while the Alba roundabout will be transformed into the country’s first three-level interchange. The project is scheduled for completion by August 2018. Work is being carried out by Kuwait Constructions, Abdulla Ahmed Nass & Works and the Bahraini Minister of Municipalities & Urban Planning Affairs. Kuwait is
  • Saudi Arabia’s high crash rate
    March 29, 2016
    Crashes present a large financial drain on Saudi Arabia’s GDP. The country’s high crash rate is reported to cost the country as much as US$5.33 billion/year, according to Arab News. Careless driving and tailgating are primary causes of crashes in Saudi Arabia, as well as eating, using mobile phone and speeding. The report says that around 40,000 injuries/year are caused by crashes. Worryingly, 80% of those with registered physical handicaps are as a result of crashes according to official figures while 30%