Skip to main content

Russia's new road link

Plans are in hand in Russia for a new bridge spanning the Kuban River in Krasnodar. The 300m bridge will carry four lanes of traffic when it is complete over the Kuban River. The design work for the bridge is expected to be complete in spring 2013. The new bridge will help reduce congestion as the current Yablonovsky Bridge features just two lanes. It was designed to handle 6,000 vehicles/day but is instead carrying up to 30,000 vehicles/day.
April 20, 2012 Read time: 1 min
Plans are in hand in Russia for a new bridge spanning the Kuban River in Krasnodar. The 300m bridge will carry four lanes of traffic when it is complete over the Kuban River. The design work for the bridge is expected to be complete in spring 2013. The new bridge will help reduce congestion as the current Yablonovsky Bridge features just two lanes. It was designed to handle 6,000 vehicles/day but is instead carrying up to 30,000 vehicles/day.

Related Content

  • Trafficnow and Isbak win Istanbul contract
    May 13, 2013
    Trafficnow and Isbak are working together to provide 250 DeepBlue Sensors in Turkey’s commercial centre Istanbul. These units will be installed along all the major corridors and access points of the city and the deal also includes the DeepBlue Core centralised system. This award is of note and could help make a major contribution to taming Istanbul’s notoriously congested streets. Split between Asia and Europe, Istanbul has some 2.6 million vehicles on its road network of 25,000km as well as a population of
  • New Tanzanian bridge project moving ahead
    August 2, 2019
    Tanzania’s planned Kigongo-Busisi Bridge will span part of Lake Victoria and improve transport connections for the country’s Mwanza Region.
  • Nepal bridge closes due to defect
    March 14, 2019
    The bridge spanning the Bijaypur River in Nepal has been closed to traffic due to serious structural problems. The bridge forms part of the Prithvi Highway and connects Bijaypur with Chauthe. Major cracks have been detected in structural members of the 74m-long steel girder bridge, which was erected in 2011. The bridge carries around 6,000 vehicles/day and repairs to the link are expected to take at least one month to complete. The local Road Division office is erecting a temporary structure upstream of the
  • North Carolina highway contract awarded
    August 16, 2019
    A contract for a 12km highway upgrade project has been awarded to a joint venture by the NC Department of Transportation (NCDOT). Fluor says it will book the US$263 million contract in the third quarter of 2019. The project will widen I-26 from two lanes to four lanes in each direc