Skip to main content

Russia’s flood-hit Tyva republic left with big motorway and bridge repair bill

Fifteen bridges were destroyed and 144.7km of motorway damaged during the May 2014 floods in the Russian republic of Tyva, contributing to what authorities say is an infrastructure repair bill of €15.83 million (RUB 748.27 million. The Russian government is considering subsidies to the region worth €16.25 million in the short term. This will go towards meeting all types of flood damage costs. Meanwhile, the road fund for Russia’s Nizhny Novgorod region is to receive €177.99 million (RUB 8.4 billion) in 201
June 23, 2014 Read time: 1 min
Fifteen bridges were destroyed and 144.7km of motorway damaged during the May 2014 floods in the Russian republic of Tyva, contributing to what authorities say is an infrastructure repair bill of €15.83 million (RUB 748.27 million. The Russian government is considering subsidies to the region worth €16.25 million in the short term. This will go towards meeting all types of flood damage costs.

Meanwhile, the road fund for Russia’s Nizhny Novgorod region is to receive €177.99 million (RUB 8.4 billion) in 2014 - around 11.3% less than in 2013.

Related Content

  • Moscow-Kazan highway contracts awarded
    September 22, 2020
    Contracts have been awarded for the Moscow-Kazan highway.
  • Major road plans are being set for Russia’s two key cities
    May 14, 2012
    Targets are being set for road investment, construction and repairs in Russia. To meet the country’s infrastructure needs, Russia’s National Association of Builders estimates that some 1,500km of roads must be built/year. Meanwhile the highway authorities in Moscow are aiming to repair around 33% of the city’s road surface every year. Some 23.6 million m2 of road surface will be repaired in Moscow during 2012, compared with 24.7 million m2 in 2011.
  • Repairs to Guerrero, Mexico hurricane-hit roads and bridges near end
    March 31, 2014
    The Secretariat of Communications and Transport (SCT) in Mexico has announced that roads and bridges in Guerrero affected by hurricanes during September 2013 will be repaired by mid-May 2014. However, repairs on the Barra Vieja bridge, costing US$38.27 million (MXN 500 million), will only be completed on 15 September 2014. Other projects are also planned for Guerrero, including school and housing schemes, following the hurricane damage. Guerrero will receive funds of more than MXN 30bn from the central gov
  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.