Skip to main content

Russia’s crucial city link – construction underway

Construction is still underway on Russia’s key highway project, the M11 route connecting Moscow with St Petersburg. The seventh stage of the project, measuring 103km, is now opening for traffic. Building this seventh stage involved laying 7.6 million m2 of asphalt and using 13 million m3 of sand. The eighth stage of the M11 highway will connect with the St Petersburg Ring Road and is around 85% complete. Should work continue to plan, the entire M11 highway will open to traffic in October 2019.
August 8, 2019 Read time: 1 min

Construction is still underway on Russia’s key highway project, the M11 route connecting Moscow with St Petersburg. The seventh stage of the project, measuring 103km, is now opening for traffic. Building this seventh stage involved laying 7.6 million m2 of asphalt and using 13 million m3 of sand. The eighth stage of the M11 highway will connect with the St Petersburg Ring Road and is around 85% complete. Should work continue to plan, the entire M11 highway will open to traffic in October 2019.

Related Content

  • Tender for section of Moscow-St Petersburg highway
    October 17, 2012
    The Moscow authorities are holding a tender for building a section of Moscow - St.Petersburg highway. The project includes construction of a North Literal Highway section with 15 viaducts. The maximum contract price has been set at US $ 953.12 million (RUB 29.70bn). The tender results will be announced on 30 October 2012. The works must be implemented within 24 months. Mostotrest and Transstroy can take part in the tender. Engeocom is not going to participate.
  • Romanian bridge project well underway
    June 8, 2022
    Romania’s Braila Bridge project is well underway.
  • Russian road projects for Krasnodar and Siberia
    July 2, 2018
    Construction will commence in 2019 for a new bypass stretch around Krasnodar in Russia. The project is for the western bypass for Krasnodar (South), which will link the route from Krasnodar to Temryuk with the M-4 Don Federal highway. The new road stretch provides a key link for the new highway and bridge route across the Kerch Strait to connect with the Crimean Peninsula. The bypass section is designed to carry up to 30,000 vehicles/day.
  • Polish projects provide transport plan
    September 19, 2014
    Poland is planning to enter seven transport projects to the Connecting Europe Programme, with these having a combined value close to €2.86 billion. Among the planned projects are the S61 express road between the Lithuanian border and Augustow. Meanwhile STRABAG and Budimex have formed a consortium that will construct a 41km stretch of the A4 highway in Poland. The section of the route runs from Rzeszów to Jarosław, in south-eastern Poland. The project is expected to take 14 months to complete and the contra