Skip to main content

Russian route repair contract awarded

Contractor VAD is to carry out the repair works to the A-181 Scandinavia Highway in Russia. The work is worth close to US$43 million and will have to be completed by 17th December 2018. The upgrade work will be carried out on the section of the highway that lies between Vyborg and Svetogorsk.
December 14, 2017 Read time: 1 min

Contractor VAD is to carry out the repair works to the A-181 Scandinavia Highway in Russia. The work is worth close to US$43 million and will have to be completed by 17th December 2018. The upgrade work will be carried out on the section of the highway that lies between Vyborg and Svetogorsk.

Related Content

  • Brazilian road projects on track
    February 15, 2012
    A package of road works worth some US$206 million will be carried out in Brazil's Sao Paulo State. The civil engineering work will be focused on roads in the Baixada Santista area.
  • Kerch connection in Russia
    October 13, 2017
    The Tavrida Federal highway that will connect with the Kerch Strait Bridge in Russia has a projected cost of US$2.92 billion. The road will run through Kerch, Feodosia, Simferopol, Bakhchisarai, and Sevastopol and will measure 277km long. The project is being handled by contractor VAD Company.
  • UK tourist A591 road in Cumbria gets repaired after storm damage
    June 17, 2016
    The UK’s A591 road in Cumbria was badly damaged in last December’s storms but recent work on a retaining wall is making life easier for construction crews. The vital Lake District tourist route, which stretches between Grasmere and Keswick, has been closed between St Johns in the Vale and Dunmail Raise following storms Desmond and Eva. A new 106m retaining wall - the length of a football pitch - is being built in the beck alongside the part of the A591 which collapsed during the bad weather. Contractors
  • Colombia's road plans
    March 22, 2012
    The Colombian authorities have launched 17 road infrastructure tenders worth a total of US$1.89 billion. The tender process is remaining open until 30th January 2012.