Skip to main content

Russian road and bridge deal

A new bypass and bridge project for Tolyatti will commence in Russia’s Samara region. The bridge will span the Volga River and the work is costing US$462.4 million. The funds will be allocated in three stages. The first tranche will be received in 2019, while the second and third will be transferred in 2020 and 2021 respectively. The 97km road project includes the 3.75km bridge link, with opening due in 2024.
April 17, 2019 Read time: 1 min

A new bypass and bridge project for Tolyatti will commence in Russia’s Samara region. The bridge will span the Volga River and the work is costing US$462.4 million. The funds will be allocated in three stages. The first tranche will be received in 2019, while the second and third will be transferred in 2020 and 2021 respectively. The 97km road project includes the 3.75km bridge link, with opening due in 2024.

Related Content

  • US$5.9 billion for three Philippines expressways
    July 10, 2024
    US$5.9 billion is being spent for three new expressways in the Philippines.
  • US$4.4 billion planned for Indian roads
    February 14, 2024
    US$4.4 billion of works are being planned for two Indian road projects.
  • Colombia’s Toyo Tunnel project underway
    September 14, 2018
    Construction is ongoing for Colombia’s Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.
  • Funds agreed, further funds sought for Paraguay road and bridge projects
    May 13, 2014
    Paraguay's Ministry of Public Works and Communications (MOPC) has requested a US$289.45 million donation from the Mercosur Structural Convergence Fund (Focem) for the second stage of the Costanera road project (Costanera II) and a second bridge connecting the country to Brazil. Of this total, around $117.44 million will be allocated to works on Costanera II. This is higher than the initial estimate of $100 million, with 60% covered by Focem and 40% financed by a local counterpart. The bridge, which will req