Skip to main content

Russian road and bridge deal

A new bypass and bridge project for Tolyatti will commence in Russia’s Samara region. The bridge will span the Volga River and the work is costing US$462.4 million. The funds will be allocated in three stages. The first tranche will be received in 2019, while the second and third will be transferred in 2020 and 2021 respectively. The 97km road project includes the 3.75km bridge link, with opening due in 2024.
April 17, 2019 Read time: 1 min

A new bypass and bridge project for Tolyatti will commence in Russia’s Samara region. The bridge will span the Volga River and the work is costing US$462.4 million. The funds will be allocated in three stages. The first tranche will be received in 2019, while the second and third will be transferred in 2020 and 2021 respectively. The 97km road project includes the 3.75km bridge link, with opening due in 2024.

Related Content

  • A new bridge link will be built between Azerbaijan and Russia
    March 28, 2017
    A new bridge will be built spanning the Samur River, which forms part of the border between Azerbaijan and Russia. Construction work is expected to commence later this year. Much of the initial financing for the bridge project will come from Azerbaijan’s budget, although Russia’s Federal Road Agency will pay its portion in due course, as well as funding work on the connecting roads. The project should be complete by 2019 if all goes to plan.
  • Chinese funding for Russian infrastructure projects?
    February 7, 2022
    Chinese funding is being sought for Russian infrastructure projects.
  • New road and bridge projects for Vietnam
    May 27, 2020
    New road and bridge projects are being planned for Vietnam.
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh