Skip to main content

Russian road and bridge deal

A new bypass and bridge project for Tolyatti will commence in Russia’s Samara region. The bridge will span the Volga River and the work is costing US$462.4 million. The funds will be allocated in three stages. The first tranche will be received in 2019, while the second and third will be transferred in 2020 and 2021 respectively. The 97km road project includes the 3.75km bridge link, with opening due in 2024.
April 17, 2019 Read time: 1 min

A new bypass and bridge project for Tolyatti will commence in Russia’s Samara region. The bridge will span the Volga River and the work is costing US$462.4 million. The funds will be allocated in three stages. The first tranche will be received in 2019, while the second and third will be transferred in 2020 and 2021 respectively. The 97km road project includes the 3.75km bridge link, with opening due in 2024.

Related Content

  • New Russian bridge planned
    August 16, 2019
    A new bridge will be built in Russia’s North-West region. The bridge will span the Sheksna River at Cherepovets. The project is expected to cost US$247.5 million. Preparatory works will commence during 2019 and the approach roads to the link are being improved. The 1.13km bridge will be the longest in the Vologda Region and should be ready by 2022. A new 8km southern bypass for Cherepovets with three lanes in either direction will also be built as part of a wider plan to improve transport for the city.
  • New Russian bridge to span Volga
    July 6, 2020
    A new Russian bridge is planned to span the River Volga.
  • Russian bypass project planned
    February 18, 2022
    A major Russian bypass project is being planned.
  • Russian relief road project for Moscow
    May 3, 2019
    A new relief road project is going ahead in Russia’s capital, Moscow. The four lane relief road for the Ostafievskoe Highway in Moscow is due for completion in 2020. The 3.75km link will feature crosswalks, traffic lights and intersections and a 200m bridge section. Noise barriers will be installed along 1.2km of the route.