Skip to main content

Russian highway deal awarded

In Russia the contractor Primorsky UPK is to construct a highway connecting Primorsk with the A-181 Skandinavia Highway. The 42km highway is expected to cust US$375.3 million to build and should be ready for traffic by 2022. The contract also includes rebuilding a stretch of the existing Primorskoe Highway. Another portion of the work will be to build a 74m overpass over the Primorskoe Highway and the rail link connecting Primorsk to Ermilovo.
October 14, 2019 Read time: 1 min

In Russia the contractor Primorsky UPK is to construct a highway connecting Primorsk with the A-181 Skandinavia Highway. The 42km highway is expected to cust US$375.3 million to build and should be ready for traffic by 2022. The contract also includes rebuilding a stretch of the existing Primorskoe Highway. Another portion of the work will be to build a 74m overpass over the Primorskoe Highway and the rail link connecting Primorsk to Ermilovo.

Related Content

  • New Russian highway section opening
    September 21, 2018
    The first section of Russia’s new A181 Scandinavia highway is due to open to traffic in October 2018. However, this is 12 months later than was originally planned as the project has been subject to a number of unforeseen issues. The new link will connect St Petersburg with Ogonki and the work has been carried out by contractor VAD, costing US$148.3 million.
  • New Russian highway section opening
    September 21, 2018
    The first section of Russia’s new A181 Scandinavia highway is due to open to traffic in October 2018. However, this is 12 months later than was originally planned as the project has been subject to a number of unforeseen issues. The new link will connect St Petersburg with Ogonki and the work has been carried out by contractor VAD, costing US$148.3 million.
  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around
  • New highway stretches for Russia
    May 21, 2020
    New highway stretches are being planned for Russia.