Skip to main content

Russian bypass work to commence

Russia’s Krasnodar bypass work is due to commence shortly.
By MJ Woof July 30, 2020 Read time: 1 min
Work will start in 2020 on Russia’s Krasnodar bypass - image © courtesy of Mohamed Osama, Dreamstime.com

Work is due to commence shortly for the Krasnodar Bypass project in Southern Russia. The construction activity on the Far Western Bypass stretch should get underway in the third quarter of 2020.

Before the building work commences, archaeological digs are being carried out in the area. A 59,000m2 area has been targeted for the historical excavation work. This activity is a requirement for the project.

The bypass will be 51km in length in all. It will feature four bridges, 20 overpasses and three major interchanges.

Related Content

  • Texas highway deal for joint venture
    August 12, 2021
    An important Texas highway project is being carried out by a joint venture.
  • Russia’s trans-continental route
    August 10, 2018
    Russia is spending US$10 billion on building a 2,000km section of road connecting China with the EU – Eugene Gerden reports Russia has now started building a 2,000km section of a new transcontinental route, which will connect China and the EU. According to senior officials from the Russian Ministry of Transport, which is implementing the project, the new road, will be known as the Meridian and will stretch through the Russian territory that borders with Kazakhstan and Belarus. This route forms the Russian
  • Challenging Colombian tunnel completed
    May 30, 2024
    A tunnel stretch on Colombia’s Santa Fe - Cañasgordas highway is complete – Mauro Nogarin reports
  • Revamp for Russian route connecting to Crimea crossing
    October 19, 2018
    A major road revamp project is being planned in Russia. The approach routes to the new bridge connecting with Crimea will be improved, boosting capacity, safety and traffic flow. The project will run as part of a series of transport upgrades in the Krasnodar Region, running until 2024 and worth a total of US$1.3 billion. A 136km stretch of the 150km stretch of highway between Krasnodar and Temryuk will be improved, in a bid to meet the anticipated jump in traffic from around 10,000-20,000 vehicles/day at