Skip to main content

Russian bridge deal

In Russia the contractor Mostotrest will build a bridge across the Sura river on the M-7 Volga federal highway. The deal is worth US$131.3 million.
February 14, 2012 Read time: 1 min
In Russia the contractor 2450 Mostotrest will build a bridge across the Sura river on the M-7 Volga federal highway. The deal is worth US$131.3 million. Mototrest signed the deal for the project with the Nizhniy Novgorod-Ufa Highway Office of the 2612 Federal Road Agency (Uprdor Volga).

For more information on companies in this article

Related Content

  • Another bridge over the River Drina
    October 29, 2020
    Cost of the two-lane bridge between Bosnia and Serbia is reportedly around €13 million.
  • New Zambezi River bridge to link Botswana and Zambia
    August 13, 2015
    Work is now underway on the new Zambezi River crossing, which will improve transport links between Botswana and Zambia. The new bridge crosses the river close to the Zambian town of Kazungula and is costing some US$259.3 million to construct. The bridge will be 923m long and will carry both rail and road traffic, with border posts located at either end. The project is being carried out by South Korean contractor Daewoo Engineering and Construction. Financing for the project is being provided by the African
  • Serbia inks two road deals with China at 16plus1 summit
    April 23, 2019
    Serbia said it signed two road construction agreements with China during the 16plus1 Summit in Dubrovnik, Croatia earlier this month. The two deals are for construction of the Pozega-Boljare and Novi Beograd-Surcin road routes. The Pozega-Boljare project alone is worth €2 billion and will be financed from the existing loan from the Exim Bank, according to media reports. China’s east-west Belt and Road Initiative was the focus of the annual 16plus1 Summit that brought together leaders from Beijing plus
  • A new bridge link will improve connectivity in the Ural mountains
    April 16, 2012
    By order of Natalya Komarova, the governor of the Khanty-Mansi Autonomous Area (Urals), A feasibility study is underway for the second bridge across the Ob River construction in Russia’s Surgut region. The 1.56km bridge will take 5-6 years to construct and will cost over US$1 billion to build. The first bridge over the Ob River was built in 2000. Average daily traffic already exceeds its planned volume, which is why the second crossing is required.