Skip to main content

Rotterdam’s bridge link upgrade project

Rotterdam’s bridge link upgrade project is being planned.
By MJ Woof June 18, 2020 Read time: 1 min
The Van Brienenoordbrug in Rotterdam will be upgraded – image © courtesy André Muller, Dreamstime.com

Upgrade work is being planned in The Netherlands for Rotterdam’s Van Brienenoordbrug bridge. The work is expected to cost from €380-600 million to carry out. The work is intended to commence in 2025 and should be complete by 2027.

The tied-arch bridge features inclined hangers and was opened to traffic in 1965. A new temporary bridge will be constructed alongside the existing structure to carry traffic while the work is carried out.

The 1.32km bridge carries six lanes of traffic in either direction, handling around 250,000 vehicles/day. The bridge forms part of the A16 highway, the busiest route in The Netherlands.

The improvements are needed to help upgrade and reinforce the structure of the bridge due to the enormous traffic load it has to cope with.

Related Content

  • Colombia’s latest bridge project
    October 12, 2018
    The new contract for Colombia’s Chirajara Bridge project has now been awarded to a consortium, Eiffage-Puentes y Torones. The consortium will handle the design and construction work for the new bridge. The structure will be a replacement for the earlier bridge, which collapsed as its construction was being finalised in January 2018, just a few months before it had been scheduled to open for traffic in March 2018. The collapse of the earlier structure resulted in 10 fatalities as well as causing serious inju
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Asphalt milling optimised by 3D controls
    February 20, 2012
    3D machine controls can optimise milling efficiency, Mike Woof reports. More efficient milling and recycling operations can be carried out by using the latest 3D control systems on the market. At the last Trimble Dimensions event in Las Vegas, the advantages of 3D controls for milling operations proved a key topic. The use of 3D control systems can offer huge advantages in milling operations. This technology helps increase productivity as the milling machine will only remove what is required, which also hel
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia