Skip to main content

Rosavtodor roadshow for highway bridge over Russia’s Lena River

Rosavtodor has held a roadshow for the construction and operation of a highway bridge over the Lena River near Yakutsk in eastern Russia. A public-private partnership project, a starting price for the bridge’s construction has been set at US$1.95 billion (RUB 64 billion). Investments will have at least 5% of the project funds. The bridge is to be engineered and built in six years. Private investors will maintain the bridge for eight years, receiving regular payments from the state amounting to $485.68 milli
August 20, 2013 Read time: 1 min
Rosavtodor has held a roadshow for the construction and operation of a highway bridge over the Lena River near Yakutsk in eastern Russia.

A public-private partnership project, a starting price for the bridge’s construction has been set at US$1.95 billion (RUB 64 billion). Investments will have at least 5% of the project funds. The bridge is to be engineered and built in six years. Private investors will maintain the bridge for eight years, receiving regular payments from the state amounting to $485.68 million (RUB 16bn).

Tender applications for the private partner position will be accepted until 30 August 2013. 3382 Transstroy, Mostovik, the managing construction company Most, 2450 Mostotrest, and 5872 Sibmost have all expressed interest in the project.

For more information on companies in this article

Related Content

  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Delays on Slovakian projects
    July 9, 2012
    Work on several new highways being built in Slovakia as public-private partnerships (PPPs) will be delayed by six to 12 months. This means that the first sections of the Martin-Presov link will not open before 2011. The last section is expected to be completed in either late 2012 or early 2013.
  • STRABAG reports satisfactory financial performance
    February 22, 2016
    Construction firm STRABAG says that its performance in the 2015 financial year was ‘satisfactory’ and that its outlook for 2016 is positive. “We closed an overall satisfactory year in 2015 with a higher output volume on nearly unchanged employee levels and a lower order backlog. In 2016 we want to maintain the output volume at its high level and raise our EBIT margin to 3%. Thanks to our improved risk management and cost reductions, we are confident that we will reach this goal after having also succeeded i