Skip to main content

Romania’s road construction projects delayed

A new report highlights the slow pace of road construction in Romania. This reveals that during 2016, the country only had a total of 747km of motorway class roads. The survey was carried out by Romania's National Institute of Statistics (INS). The report reveals that this is the same total motorway length as in 2015, highlighting that no new stretches were opened to traffic during 2016. Motorways account for a mere 4.2% of Romania’s total road network. The country has 86,080km of roads in all, of which 36%
May 3, 2017 Read time: 1 min
A new report highlights the slow pace of road construction in Romania. This reveals that during 2016, the country only had a total of 747km of motorway class roads. The survey was carried out by Romania's National Institute of Statistics (INS). The report reveals that this is the same total motorway length as in 2015, highlighting that no new stretches were opened to traffic during 2016. Motorways account for a mere 4.2% of Romania’s total road network. The country has 86,080km of roads in all, of which 36% are either cobbled or of gravel construction and are not surfaced with either asphalt or concrete. During 2016, just 4% of Romania’s total road network saw any upgrades at all.

Related Content

  • The radically changing face of UK highways management
    May 14, 2014
    The British Government policy paper ‘Action for Roads: A network for the 21st century’ sets out radical change to the strategic way roads are funded and managed – including plans to turn the Highways Agency into a Government-owned company and a pledge to invest over €33.4 billion (£28 billion) in roads maintenance between 2015 and 2020. Jenny Moten, Highways Agency divisional director for Network Services, gave a keynote presentation on the new approach to strategic highways management during the Road Safet
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Cables up for Romania’s Brăila Bridge
    June 16, 2021
    The Astaldi and IHI Infrastructure Systems joint venture reports that work will soon start on the road deck for Romania’s Brăila Bridge.
  • Romania sets aside €1.42 billion for local roads
    July 23, 2021
    Prime minister Florin Cîţu has had discussions with European Commission President Ursula von der Leyen to fund the country's proposed National Recovery and Resilience Plan, NRRP.