Skip to main content

Romania's new tunnel deal

A consortium will build a new tunnel in Romania as part of the Orastie-Sibiu highway project.
February 24, 2012 Read time: 1 min
A consortium will build a new tunnel in Romania as part of the Orastie-Sibiu highway project. The tunnel lies on the section of highway between kilometres 71+870 and 72+210 and the project was awarded by Romania's National Highways and Roads Company. The consortium carrying out the contract comprises 1324 Astaldi, 3172 Euroconstruct Trading 98 and 3173 Astalrom. In all work on the tunnel for the Orastie-Sibiu highway will cost €113.56 million. Meanwhile the Transport Ministry in Romania is planning to allocate around €84.3 million for repair works to sections of road totalling 183.5km in the counties of Caras-Severin, Timis, Tulcea, Ialomita and Brasov.

For more information on companies in this article

Related Content

  • Breakthrough near for Čebrať Tunnel
    December 17, 2021
    The 3.5km-long tunnel through Slovakia’s Čebrať Hills is part of the D1 Ružomberok bypass.
  • Romania to start work on the Sibiu-Pitesti A1 section in 2017
    April 17, 2015
    Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report. Around €1.6 billion will be spent on the route that will run through 20km of mountains. In February, the National Highway and Roads Company, CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway. But that contract has been challenged and will be scrutinised by th
  • STRABAG working on Slovakian highway
    December 16, 2013
    A consortium is now working on the construction of one stretch of Slovakia’s D1 highway. The section lies between Hričovské Podhradie and Lietavská Lúčka and the project is worth €427 million. The consortium comprises four companies; with Doprastav, Váhostav and STRABAG all holding equal 32% stakes of the contract and Metrostav having a minority 4% share. The work being carried out by Doprastav, Váhostav and STRABAG is equivalent to some €140 million each. The construction work is expected to take 48 months
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill