Skip to main content

Romanian contract for STRABAG

A new Romanian road contract has been won by STRABAG.
By MJ Woof June 9, 2020 Read time: 1 min
STRABAG will carry out work on a further stretch of Romania’s A3 highway project

The Austrian contractor STRABAG has been awarded the follow-up contract for the A3 highway in Romania. This 4.5km highway section runs between Ungheni and Târgu Mureș and the work will include building a spur route.

The value of the contract for the road stretch from Ungheni and Târgu Mureș is worth €40 million. The spur route included in the deal itself measures 4.7km and features two lanes in either direction. The work is planned to start in July 2020 and is expected to take 18 months to complete. The contract was awarded to STRABAG by CNAIR, the Romanian road company.

Construction of the Ungheni–Ogra section of the A3 highway was completed successfully in 2018. “A follow-up order is always a positive sign that our work has been valued by the client. After handing over the 10.1 km section between Ungheni and Ogra in 2018, we are happy to continue working on this central traffic artery,” said Thomas Birtel, CEO of STRABAG.

For more information on companies in this article

Related Content

  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Contractor Strabag reports strong performance
    April 30, 2013
    Austrian contractor STRABAG reports healthy earnings before interest and taxes (EBIT) of €207 million in 2012. This figure beats the firm’s own expectations and the expectations of the market. Net income after minorities stood at €61 million, showing an expected considerable decrease of 66.67% compared to the year before. “An output volume of €14 billion in 2012 – that’s nothing to complain about. With €13.2 billion, the end-of-the-year order backlog is also nearly exactly at the pre-crisis level of 2008, s
  • Major Romanian highway works continue
    December 21, 2022
    In Romania major highway works are continuing.