Skip to main content

Romania route – project awarded

The contracts for a major highway project in Romania have been awarded. The project is for the construction of the highway from Craiova to Pitesti. The Italian contractor, Tirrena Scavi, has a €76 million package of works to build an 18km stretch of the highway. Meanwhile local firms forming part of the Dorinel Umbrarescu Group have a €309 million package of works to build a 40km stretch of the route.
October 5, 2018 Read time: 1 min

The contracts for a major highway project in Romania have been awarded. The project is for the construction of the highway from Craiova to Pitesti. The Italian contractor, Tirrena Scavi, has a €76 million package of works to build an 18km stretch of the highway. Meanwhile local firms forming part of the Dorinel Umbrarescu Group have a €309 million package of works to build a 40km stretch of the route.

Related Content

  • Polish programme of road development
    September 2, 2015
    A series of major road projects is now getting underway in Poland, while tenders for new projects are also opening. Estimates suggest that the construction of six new ring-roads in the Opolszczyzna region will cost some €356 million. These ring roads all form part of the 2014-2023 National Road Construction Programme. The first projects to be carried out will be for the ring-roads around Mysliny and Niemodlina. In all, the National Road Construction Programme will include the building of 57 ring-roads.
  • Texas highway projects moving ahead
    June 4, 2018
    Two major highway projects are now moving ahead in Texas. One project is for the Grand Parkway around Houston, the other is for the construction of three bridges at an interchange on US 290. Grand Parkway Infrastructure is to construct a stretch of the Highway 99 Grand Parkway, which will run around Houston. In all the project for the 295km gyratory highway is costing US$1.28 billion. The package of works was awarded by the Texas Department of Transportation and involves building extra toll lanes as well a
  • STRABAG building two more Polish routes
    January 12, 2018
    Contractor STRABAG has won deals to construct two more sections of the S7 route in Poland for some €198 million. The firm will build a total of 36km of the S7 route to the north of capital Warsaw. The construction work for the four lane route is expected to take 34 months to complete. One stretch runs from Strzegowo to Pieńki and is 22km long, the other stretch is 14km long and runs from Pieńki to Płońsk. The package of works also includes the construction of several junctions and rest areas as well as
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas