Skip to main content

Romania road route now open to traffic

A key stretch of highway in Romania is now open to traffic, connecting Lugoj with Marginea. This 15km long stretch of highway forms part of the planned Lugoj-Deva highway. Located in western Romania, the highway is being built by a joint venture comprising Salini Impregilo and Societa Edile Construzioni e Lavori. The project is worth some €124 million, with the work having been supervised by Romania’s National Road Infrastructure Administration Agency (CNAIR).
March 9, 2017 Read time: 1 min
A key stretch of highway in Romania is now open to traffic, connecting Lugoj with Marginea. This 15km long stretch of highway forms part of the planned Lugoj-Deva highway. Located in western Romania, the highway is being built by a joint venture comprising 7809 Salini Impregilo and Societa Edile Construzioni e Lavori. The project is worth some €124 million, with the work having been supervised by Romania’s National Road Infrastructure Administration Agency (CNAIR).

For more information on companies in this article

Related Content

  • Four offers for Sibiu-Pitesti A1 motorway Lot 4 section
    September 4, 2019
    Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
  • Contracts awarded for key sections of Poland’s S7 route
    June 18, 2015
    Work is starting on Poland’s S7 expressway. Italian firm Salini Impregilo is leading a consortium to construct a 21.5km stretch of the S7 expressway. The section lies between the Jedrzejow and Checiny junctions. The deal is worth nearly €144.67 million. The completion deadline is set for the third quarter of 2017. Meanwhile a consortium headed by Budimex has won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 route between Ostroda Polnoc and Ostroda Poludnie. The wo
  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th
  • Romania road tender winner selected
    November 14, 2022
    The winner has been selected in Romania for a key road tender.