Skip to main content

Romania-Bulgaria bridge

Work is progressing on track with the new Danube Bridge 2, which will connect Bulgaria and Romania.
March 1, 2012 Read time: 1 min
Work is progressing on track with the new Danube Bridge 2, which will connect Bulgaria and Romania. Around 60% of the work has now been completed, along with some 50% of the connecting roads and other necessary infrastructure improvements. The new bridge will run from Vidin in Bulgaria to Calafat in Romania and it is due for completion by the end of 2011. The bridge will provide a combined road and rail link and the connections to the Romanian and Bulgarian networks will be finished after the bridge itself has been completed.

Related Content

  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • Romania eyes new Danube River bridge
    August 20, 2024
    The announcement by Romania’s minister for transport, Sorin Grindeanu, comes as the Friendship Bridge, connecting Giurgiu in Romania and Ruse in Bulgaria, is closed for repairs.
  • Romania’s Cosmeşti Bridge work underway
    April 21, 2022
    The existing Cosmeşti Bridge, which opened in 1924, is a combined road and rail structure.
  • Danube Bridge 2 official opening
    June 13, 2013
    The new Vidin–Calafat Bridge – also known Danube Bridge 2 – was being officially opened today. A road and rail bridge between the cities of Calafat, Romania and Vidin, Bulgaria, Danube Bridge 2 is the second bridge on the shared section of the Danube between Romania and Bulgaria. Expected to today’s event were dignitaries including the president of the Republic of Bulgaria Rosen Plevneliev, Romania Prime Minister Victor Ponta, and European Commissioner for Regional Policy Johannes Hahn.