Skip to main content

Robotic parking project for Atlantic City

Boomerang Systems, a designer and manufacturer of automated robotic parking and self-storage systems, has been contracted to supply 249 parking spaces utilising its RoboticValet parking system in the Metropolitan Project in Atlantic City,
March 14, 2012 Read time: 1 min

3875 Boomerang Systems, a designer and manufacturer of automated robotic parking and self-storage systems, has been contracted to supply 249 parking spaces utilising its RoboticValet parking system in the Metropolitan Project in Atlantic City, New Jersey. The Metropolitan is a state of the art residential tower that will rise to nearly 400 feet with spectacular panoramic views of the Atlantic Ocean. The project contains 124 residential units and approximately 5,000 square feet of retail space opening directly onto the Boardwalk, next to the new Revel Casino.

Chip Pressman, head of development for 3919 Lazocean, the developer, was recently quoted as stating he chose the Boomerang RoboticValet System due to its simplicity and reliability. "When you initially think of robotic parking you think of complicated and strange things. But when you see Boomerang's System operate you realise it is really very simple."

For more information on companies in this article

Related Content

  • Tunnels and bridges, improving Argentina's major road link
    April 24, 2012
    A road improvement plus tunnel and bridge building contract in an area once inhabited by dinosaurs in northern Argentina, is a small but key part of an ambitious project to complete a road that will eventually link the Atlantic and Pacific coasts of Latin America - Adriana Potts reports. Remote, rough and spectacular are words that come to mind when describing the mountains of Ischigualasto in Argentina's northern province of San Juan This is the only place in the world where an undisturbed sequence of rock
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Case lightens French traffic
    February 18, 2013
    Two new Case CX series excavators played a leading role in a major €1.5 million project to improve traffic flow at the Terres Saint Jean business and shopping park in Épinal, eastern France. Purchased by French firm Peduzzi TP, the CX250C and a CX350C machines are helping to renew the infrastructure, improve traffic flow and safety at the junction with the RN 57. The Épinal town council commissioned works, which began in March 2012, included the construction of an underground passage under the RN 57 linking
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.